ESC07-00904
| General Inspection | 2/19/2009 | 2/19/2009 | 2/19/2009 4:56:52 PM | P | PASS |
|
|
sign posted site looks fine
|
ELE08-00373
| Electrical Rough-In | 2/19/2009 | 2/19/2009 | 2/19/2009 4:50:25 PM | P | PART |
|
|
John- ceiling Phone #: ###-#### ok cover ceiling anop
|
ELE09-00083
| Final | 2/19/2009 | 2/19/2009 | 2/19/2009 4:49:29 PM | P | PASS |
|
|
ok final
|
ESC08-00980
| General Inspection | 2/19/2009 | 2/19/2009 | 2/19/2009 2:23:50 PM | P | PASS |
|
|
sign posted site looks fine
|
ELE08-03257
| Final | 2/19/2009 | 2/19/2009 | 2/19/2009 2:23:10 PM | P | PASS |
|
|
Final Electrical Inspection. Please call Vince @ ###-#### Phone #: ###-#### Internet Inspection Request from: Beka Hereau ok final
|
ELE09-00256
| Permanent Service | 2/19/2009 | 2/19/2009 | 2/19/2009 12:07:06 PM | P | PASS |
|
|
appointment for 12:00 pm with todd ###-#### for service p/s u/g n ok note meter only
|
ELE09-00256
| Final | 2/19/2009 | 2/19/2009 | 2/19/2009 12:06:39 PM | P | PASS |
|
|
appointment for 12:00 pm with todd ###-#### for service ok final for service note not esc permit in project
|
ELE09-00256
| Permanent Service | 2/18/2009 | 2/19/2009 | 2/19/2009 11:33:14 AM | A | CANC |
|
|
###-#### Internet Inspection Request from: Todd Holbrook changed to pm inpection
|
ELE08-03040
| Final | 2/19/2009 | 2/19/2009 | 2/19/2009 9:24:48 AM | A | PASS |
|
|
ok sign final
|
ELE08-03018
| Final | 2/19/2009 | 2/19/2009 | 2/19/2009 9:22:02 AM | A | PASS |
|
|
ok wall sign final
|