BLD08-00224
| FIRE-Conference | 2/18/2009 | 2/19/2009 | 2/20/2009 2:31:31 PM | A | DONE |
|
|
This was for a conference covering the sprinkler monitoring. It also included flushing the underground sprinkler supply
|
BLD08-01506
| FIRE-Final Inspection | 2/18/2009 | 2/19/2009 | 2/19/2009 7:09:26 PM | P | PASS |
|
|
Life safety passed. Contractor is to install the building address as discussed.
|
BLD09-00152
| FIRE-Final Inspection | 2/18/2009 | 2/19/2009 | 2/19/2009 7:08:18 PM | A | FAIL |
|
|
Provide annual inspection for the fire extinguishers. The request to exit sensor for the exterior exit doors had to be adjusted while I waited. All other items are ok.
|
FIR08-00522
| INSP-Final Inspection | 2/17/2009 | 2/19/2009 | 2/19/2009 7:06:23 PM | A | PASS |
|
|
Permit finaled. I made two trips to this project. After the initial inspection I found that due to field changes an additional strobe was required in the west classroom due to a wall that was added. A 30cd strobe was added and the system functioned correctly.
|
BLD09-00182
| FIRE-Final Inspection | 2/19/2009 | 2/19/2009 | 2/19/2009 1:57:36 PM | P | PASS |
|
|
life safety passed
|
FIR08-00531
| INSP-Final Inspection | 2/17/2009 | 2/19/2009 | 2/19/2009 11:59:41 AM | A | PASS |
|
|
Permit finaled. Mike is following up on the expansion tank pre-charge.
|
BLD08-01600
| FIRE-Final Inspection | 2/18/2009 | 2/19/2009 | 2/19/2009 11:58:22 AM | A | PASS |
|
|
Life safety passed. I notified Gordon about my concerns with a fire retardant that has to be re-applied every three months and is to be the owners responcibility.
|