BLD08-02204
| BLD-Framing/Rough-in | 2/19/2009 | 2/19/2009 | 2/19/2009 4:08:15 PM | P | NR |
|
|
jim - firewalls Phone #: ###-####
|
BLD08-02203
| BLD-Framing/Rough-in | 2/19/2009 | 2/19/2009 | 2/19/2009 4:08:04 PM | P | NR |
|
|
jim - firewalls Phone #: ###-####
|
BLD08-02202
| BLD-Framing/Rough-in | 2/19/2009 | 2/19/2009 | 2/19/2009 4:07:52 PM | P | NR |
|
|
jim - firewalls Phone #: ###-####
|
BLD08-02207
| BLD-Framing/Rough-in | 2/19/2009 | 2/19/2009 | 2/19/2009 4:07:41 PM | P | NR |
|
|
jim - firewalls Phone #: ###-####
|
BLD08-02206
| BLD-Framing/Rough-in | 2/19/2009 | 2/19/2009 | 2/19/2009 4:07:29 PM | P | NR |
|
|
jim - firewalls Phone #: ###-####
|
BLD08-02205
| BLD-Framing/Rough-in | 2/19/2009 | 2/19/2009 | 2/19/2009 4:07:11 PM | P | PART |
|
|
jim - firewalls Phone #: ###-####
|
ESC08-00897
| BMP Violation | 2/19/2009 | 2/19/2009 | 2/19/2009 4:06:55 PM | P | FAIL |
|
|
Needs to sweep all sediments from gutterpan, street, and sidewalk. Verbal c/n given to RP.
|
ESC08-00899
| BMP Violation | 2/19/2009 | 2/19/2009 | 2/19/2009 4:06:05 PM | P | FAIL |
|
|
Needs to sweep all sediments from sidewalk, street, and gutterpans.
|
BLD08-02201
| BLD-Framing/Rough-in | 2/19/2009 | 2/19/2009 | 2/19/2009 4:04:41 PM | P | PASS |
|
|
jim - firewalls Phone #: ###-####. 2nd. floor, 2nd layer, one side of type x rock for 2hr. wall.
|
ESC08-00889
| BMP Violation | 2/19/2009 | 2/19/2009 | 2/19/2009 4:02:06 PM | P | FAIL |
|
|
Needs to sweep all sediments from street, sidewalk and gutterpans. Verbal c/n given to RP.
|
BLD08-02197
| BLD-Framing/Rough-in | 2/19/2009 | 2/19/2009 | 2/19/2009 4:01:21 PM | P | PASS |
|
|
jim - firewalls Phone #: ###-####. Verified fire rated plywood for 4ft. laydown parapet at overbuild areas.
|
ESC08-00890
| BMP Violation | 2/19/2009 | 2/19/2009 | 2/19/2009 4:00:02 PM | P | FAIL |
|
|
Needs to sweep all sediment from sidewalk, street and gutterpans. Verbal c/n given to RP.
|
BLD08-02198
| BLD-Framing/Rough-in | 2/19/2009 | 2/19/2009 | 2/19/2009 3:58:23 PM | P | PASS |
|
|
jim - firewalls Phone #: ###-####.. Verified fire rated plywood at 4ft. laydown parapet at overbuild areas.
|
ESC08-00892
| BMP Violation | 2/19/2009 | 2/19/2009 | 2/19/2009 3:57:32 PM | P | FAIL |
|
|
Needs to sweep all sediments from sidewalk, street and gutterpans. Verbal c/n given to RP.
|
BLD08-02199
| BLD-Framing/Rough-in | 2/19/2009 | 2/19/2009 | 2/19/2009 3:56:43 PM | P | PASS |
|
|
jim - firewalls Phone #: ###-####. Verified firerated plywood at 4ft. laydown parapet at overbuild areas...ok.
|
ESC08-00894
| BMP Violation | 2/19/2009 | 2/19/2009 | 2/19/2009 3:55:53 PM | P | FAIL |
|
|
Needs to sweep all sediments from street, sidewalks and gutterpan.
|
BLD08-02200
| BLD-Framing/Rough-in | 2/19/2009 | 2/19/2009 | 2/19/2009 3:55:19 PM | P | PASS |
|
|
jim - firewalls Phone #: ###-####. verified rated plywood for 4ft laydown parapet at overbuild areas.
|
BLD09-00182
| BLD-Final | 2/19/2009 | 2/19/2009 | 2/19/2009 1:28:40 PM | P | PASS |
|
|
Laura Phone #: ###-####. ok for perm occ.
|
BLD08-02205
| BLD-Framing/Rough-in | 2/18/2009 | 2/19/2009 | 2/19/2009 11:03:09 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 2/18/2009 at 5:11:51 PM. Contact: ###-####. 1st. layer type x rock for 2hr. wall from ceiling to roof deck, also verified nailing on type x rock at overbuild sections and rated plywood for 4ft. parapets at overbuild sections.
|
ESC08-00900
| BMP Violation | 2/19/2009 | 2/19/2009 | 2/19/2009 11:01:08 AM | A | FAIL |
|
|
Needs to sweep all sediments from street, sidewalk and gutterpans. Verbal c/n given to RP.
|
BLD08-02206
| BLD-Framing/Rough-in | 2/18/2009 | 2/19/2009 | 2/19/2009 11:00:04 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 2/18/2009 at 5:13:16 PM. Contact: ###-####. 1st. layer type x rock for 2hr. wall from ceiling to roof deck, also verified nailing on type x rock at overbuild sections and rated plywood for 4ft. parapet at overbuild sections.
|
ESC08-00901
| BMP Violation | 2/19/2009 | 2/19/2009 | 2/19/2009 10:58:14 AM | A | FAIL |
|
|
Needs to sweep all sediments from street, sidewalk and gutterpans. VErbal c/n given to RP.
|
BLD08-02207
| BLD-Framing/Rough-in | 2/18/2009 | 2/19/2009 | 2/19/2009 10:57:05 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 2/18/2009 at 5:14:42 PM. Contact: ###-####. 2nd layer type x rock from ceiling to roof deck, also verified nailing on type x rock for overbuilds and rated plywood for 4ft. parapet at overbuilds.
|
ESC08-00895
| BMP Violation | 2/19/2009 | 2/19/2009 | 2/19/2009 10:52:34 AM | A | FAIL |
|
|
Needs to sweep all sediments off of street, sidewalk and gutterpans.
|
ESC08-00896
| BMP Violation | 2/19/2009 | 2/19/2009 | 2/19/2009 10:51:34 AM | A | FAIL |
|
|
Needs to sweep all sediments off of street, sidewalk and gutterpan.
|
ESC08-00898
| BMP Violation | 2/19/2009 | 2/19/2009 | 2/19/2009 10:50:51 AM | A | FAIL |
|
|
Needs to sweep all sediments off streets, sidewalks and gutterpans. Verbal c/n given to RP.
|
BLD08-02202
| BLD-Framing/Rough-in | 2/18/2009 | 2/19/2009 | 2/19/2009 10:49:43 AM | A | NR |
|
|
Scheduled by a contractor via Hello! on 2/18/2009 at 10:09:27 PM. Contact: ###-####.
|
BLD08-02203
| BLD-Framing/Rough-in | 2/18/2009 | 2/19/2009 | 2/19/2009 10:49:18 AM | A | NR |
|
|
Scheduled by a contractor via Hello! on 2/18/2009 at 10:10:41 PM. Contact: ###-####.
|
BLD08-02204
| BLD-Framing/Rough-in | 2/18/2009 | 2/19/2009 | 2/19/2009 10:48:51 AM | A | NR |
|
|
Scheduled by a contractor via Hello! on 2/18/2009 at 10:12:57 PM. Contact: ###-####.
|
BLD08-02201
| BLD-Framing/Rough-in | 2/18/2009 | 2/19/2009 | 2/19/2009 10:25:01 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 2/18/2009 at 10:08:12 PM. 2nd. floor, 1st. layer type x rock for 2hr. wall, one side only ok.
|
ESC08-00889
| Tracking Control | 2/19/2009 | 2/19/2009 | 2/19/2009 10:18:06 AM | A | PASS |
|
|
|
BLD08-02197
| BLD-Framing/Rough-in | 2/18/2009 | 2/19/2009 | 2/19/2009 10:17:52 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 2/18/2009 at 5:05:26 PM. Contact: ###-####. nailing on type x rock at overbuild areas.
|
ESC08-00890
| Tracking Control | 2/19/2009 | 2/19/2009 | 2/19/2009 10:16:36 AM | A | PASS |
|
|
|
BLD08-02198
| BLD-Framing/Rough-in | 2/18/2009 | 2/19/2009 | 2/19/2009 10:16:22 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 2/18/2009 at 5:07:07 PM. type x rock at overbuild areas ok.
|
ESC08-00892
| Tracking Control | 2/19/2009 | 2/19/2009 | 2/19/2009 10:15:39 AM | A | PASS |
|
|
|
BLD08-02199
| BLD-Framing/Rough-in | 2/18/2009 | 2/19/2009 | 2/19/2009 10:15:25 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 2/18/2009 at 5:08:48 PM. Contact: ###-####. nailing for type x rock at over build areas ok.
|
BLD08-02200
| BLD-Framing/Rough-in | 2/18/2009 | 2/19/2009 | 2/19/2009 10:06:29 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 2/18/2009 at 5:10:15 PM. Contact: ###-####.Nailing for type xrock at overbuild areas ok.
|