Inspections for the day of: Thursday, February 19, 2009.
Number of inspections: 10
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorClint A Smith
TitleEROSION CONTROL INSPECTOR
Phone #794-8996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC09-00035 General Inspection2/19/20092/19/20092/19/2009 3:47:36 PMPPASS
Everything looking good on the dewatering part of the project. No real threat. All water collecting into the loggers ponds.
ESC08-00969 Site Final2/19/20092/19/20092/19/2009 2:47:17 PMPPASS
ESC07-00987 Site Preparation2/19/20092/19/20092/19/2009 1:42:59 PMPFAIL
Verbal to RP:
Clean up all trash debris on project area. Will re-inspect on 2/20/09 PM
ESC08-00706 BMP Violation2/19/20092/19/20092/19/2009 1:41:44 PMPFAIL
Verbal correction to RP:
Clean all hard surface of all sediment and debris. Both active side and un developed side.
Protect storm drains on the south side of project.
Clean up and containerize all trash debris on project area. Will re-inspect 2/20/09 PM.
ESC08-00457 General Inspection2/13/20092/19/20092/19/2009 10:43:22 AMADONE
Told RP to correct washout pit and post signage prior to next pour date and/or 3/2/09. Will re-inspect on 3/2/09 AM.
ESC08-00970 Site Preparation2/19/20092/19/20092/19/2009 10:33:47 AM PART
Working on water line fill in. Told contractor sweep up where fill in is occuring. WIll re-inspect on 2/20/09 AM.
ESC08-00996 General Inspection2/19/20092/19/20092/19/2009 10:14:44 AMAFAIL
Verbal Correction to RP via Message:
1. Provide a waste debris container for all trash debris generated on the project area.
2. Clean up all trash debris on the project area. Dispose of in a proper mannor or place into a wate container. Will re-inspect on 2/23/09 AM.
ESC06-00873 Site Final2/19/20092/19/20092/19/2009 10:09:50 AMPPASS
ESC08-00982 Complaint Inspection2/19/20092/19/20092/19/2009 9:56:49 AMPPART
Verbal to RP and Notifed the complaintee over the outcome with the RP.
1. Build a berm along fence line to pervent erosion from the the neighbors lot onto there project.
2. Clean up all hard surfaces of sediment and debris.
3. Pick up trash and place into the container.
Will re-inspect on 2/24/09AM.
ESC09-00054 General Inspection2/18/20092/19/20092/19/2009 9:01:38 AMAPART
Verbal to RP:
Need to place a weighted product on top of the wattle along the curb inlet so water does not seep underneith it. Told RP to cntact me prior to discharging occuring.