Inspections for the day of: Friday, February 19, 2010.
Number of inspections: 14
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorBob Reichert
TitleELE-INSPECTOR
Phone #794-1923
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ELE09-01947 Final2/15/20102/19/20102/19/2010 4:01:39 PMPNH
Final on Kitchen Remodel. Home owner will be home after 2:00 p.m. Inspection requested from web by: nathan palmer Phone #: ###-#### called, left card, will recall
ESC10-00009 General Inspection2/19/20102/19/20102/19/2010 3:42:56 PMPPASS
looke dok
ESC09-00748 General Inspection2/19/20102/19/20102/19/2010 3:42:11 PMPPASS
looked ok
ESC09-00778 General Inspection2/19/20102/19/20102/19/2010 3:41:36 PMPPASS
looked ok
ELE10-00306 Electrical Rough-In2/19/20102/19/20102/19/2010 3:38:47 PMPPASS
Heath-Please call prior to inspection Phone #: ###-#### ric ok, no esc this project
ELE10-00097 Electrical Rough-In2/18/20102/19/20102/19/2010 3:23:24 PMPPASS
ceiling rough in for bldg. at NE corner of property Inspection requested from web by: Lee VanSchoiack Phone #: ###-#### ok to cover ceiling only, no esc this project
ELE10-00023 Final2/18/20102/19/20102/19/2010 2:41:20 PMPPASS
Please call prior to arrival to arrange access. Inspection requested from web by: Joe Thomas Phone #: ###-#### ok to final, no esc this project
ELE10-00275 Electrical Rough-In2/19/20102/19/20102/19/2010 1:34:10 PMPPASS
chad Phone #: ###-#### ric ok, no esc this project
ELE10-00044 Permanent Service2/19/20102/19/20102/19/2010 12:17:54 PMPFAIL
mariana Phone #: ###-#### called, nh, told they need to be here and that shall install 2 guy wires in triangle manner, to recall for inspection, no esc this project
ELE10-00092 Final2/18/20102/19/20102/19/2010 10:22:05 AMAPASS
Please call if you have any questions. Inspection requested from web by: Brandon Blackham Phone #: ###-#### ok to final, no esc this project
ELE10-00147 Electrical Rough-In2/18/20102/19/20102/19/2010 10:17:58 AMAPASS
Removed dirt from trench, provided spacing for underground conduits. I will be in the boise area and would like to possibly meet the inspector on site. please give me notice of a time frame. Thanks Inspection requested from web by: Lynn Cable Phone #: ###-#### corrections made, ok to cover u/g
ELE10-00320 Electrical Rough-In2/18/20102/19/20102/19/2010 9:43:40 AMAFAIL
lynn - underground pvc conduits Phone #: ###-#### called, left message, left correction notice, NEC 300.5(A) raceway shall be 24" under parking area, 300.5(F) backfill shall not contain rocks, 310.15(B)2(b) conduit spacing shall be maintained, NOTE: corrections shall be made within 5 working days or further action will be taken
ELE10-00284 Electrical Rough-In2/18/20102/19/20102/19/2010 9:09:36 AMAPASS
Tile floor heat inspection. Home is vacant. Access through front or back door. Inspection requested from web by: Joe Thomas Phone #: ###-#### called, ok to cover floor heat only
ELE10-00236 Electrical Rough-In2/18/20102/19/20102/19/2010 8:29:31 AMAPASS
Rocky Phone #: ###-#### ric ok, no esc this project