ELE09-01947
| Final | 2/15/2010 | 2/19/2010 | 2/19/2010 4:01:39 PM | P | NH |
|
|
Final on Kitchen Remodel. Home owner will be home after 2:00 p.m. Inspection requested from web by: nathan palmer Phone #: ###-#### called, left card, will recall
|
ESC10-00009
| General Inspection | 2/19/2010 | 2/19/2010 | 2/19/2010 3:42:56 PM | P | PASS |
|
|
looke dok
|
ESC09-00748
| General Inspection | 2/19/2010 | 2/19/2010 | 2/19/2010 3:42:11 PM | P | PASS |
|
|
looked ok
|
ESC09-00778
| General Inspection | 2/19/2010 | 2/19/2010 | 2/19/2010 3:41:36 PM | P | PASS |
|
|
looked ok
|
ELE10-00306
| Electrical Rough-In | 2/19/2010 | 2/19/2010 | 2/19/2010 3:38:47 PM | P | PASS |
|
|
Heath-Please call prior to inspection Phone #: ###-#### ric ok, no esc this project
|
ELE10-00097
| Electrical Rough-In | 2/18/2010 | 2/19/2010 | 2/19/2010 3:23:24 PM | P | PASS |
|
|
ceiling rough in for bldg. at NE corner of property Inspection requested from web by: Lee VanSchoiack Phone #: ###-#### ok to cover ceiling only, no esc this project
|
ELE10-00023
| Final | 2/18/2010 | 2/19/2010 | 2/19/2010 2:41:20 PM | P | PASS |
|
|
Please call prior to arrival to arrange access. Inspection requested from web by: Joe Thomas Phone #: ###-#### ok to final, no esc this project
|
ELE10-00275
| Electrical Rough-In | 2/19/2010 | 2/19/2010 | 2/19/2010 1:34:10 PM | P | PASS |
|
|
chad Phone #: ###-#### ric ok, no esc this project
|
ELE10-00044
| Permanent Service | 2/19/2010 | 2/19/2010 | 2/19/2010 12:17:54 PM | P | FAIL |
|
|
mariana Phone #: ###-#### called, nh, told they need to be here and that shall install 2 guy wires in triangle manner, to recall for inspection, no esc this project
|
ELE10-00092
| Final | 2/18/2010 | 2/19/2010 | 2/19/2010 10:22:05 AM | A | PASS |
|
|
Please call if you have any questions. Inspection requested from web by: Brandon Blackham Phone #: ###-#### ok to final, no esc this project
|
ELE10-00147
| Electrical Rough-In | 2/18/2010 | 2/19/2010 | 2/19/2010 10:17:58 AM | A | PASS |
|
|
Removed dirt from trench, provided spacing for underground conduits. I will be in the boise area and would like to possibly meet the inspector on site. please give me notice of a time frame. Thanks Inspection requested from web by: Lynn Cable Phone #: ###-#### corrections made, ok to cover u/g
|
ELE10-00320
| Electrical Rough-In | 2/18/2010 | 2/19/2010 | 2/19/2010 9:43:40 AM | A | FAIL |
|
|
lynn - underground pvc conduits Phone #: ###-#### called, left message, left correction notice, NEC 300.5(A) raceway shall be 24" under parking area, 300.5(F) backfill shall not contain rocks, 310.15(B)2(b) conduit spacing shall be maintained, NOTE: corrections shall be made within 5 working days or further action will be taken
|
ELE10-00284
| Electrical Rough-In | 2/18/2010 | 2/19/2010 | 2/19/2010 9:09:36 AM | A | PASS |
|
|
Tile floor heat inspection. Home is vacant. Access through front or back door. Inspection requested from web by: Joe Thomas Phone #: ###-#### called, ok to cover floor heat only
|
ELE10-00236
| Electrical Rough-In | 2/18/2010 | 2/19/2010 | 2/19/2010 8:29:31 AM | A | PASS |
|
|
Rocky Phone #: ###-#### ric ok, no esc this project
|