FIR14-00065
| INSP-Final Inspection | 2/18/2014 | 2/19/2014 | 2/19/2014 3:24:15 PM | P | PASS |
|
|
Scope of fire alarm testing completed satisfactory. Permit finaled.
|
FIR14-00097
| INSP-Final Inspection | 2/18/2014 | 2/19/2014 | 2/19/2014 3:20:50 PM | P | FAIL |
|
|
Intermittent supervisory condition at the panel, NETCON 7.
|
FIR13-00675
| INSP-Final Inspection | 2/18/2014 | 2/19/2014 | 2/19/2014 3:17:45 PM | P | NR |
|
|
Pending FIR14-00097
|
FIR13-00664
| INSP-Final Inspection | 2/18/2014 | 2/19/2014 | 2/19/2014 3:14:44 PM | P | PART |
|
|
Final pending project related fire alarm permit work.
|
FIR13-00308
| INSP-Sprinkler Rough-in/Hydro | 2/18/2014 | 2/19/2014 | 2/19/2014 10:55:26 AM | A | PART |
|
|
Overhead hydrostatic test of the new system piping completed satisfactory.
|
FIR13-00661
| INSP-Sprinkler Rough-in/Hydro | 2/17/2014 | 2/19/2014 | 2/17/2014 3:31:40 PM | A | CANC |
|
|
This is an oh hydro. Stefan is the contact. Thanks Phone #: ###-#### >> Inspection requested via web by Stan Beus Inspection cancelled from web by: Stan Beus
|