MEC15-00760
| Pressure Test | 2/19/2015 | 2/19/2015 | 2/19/2015 3:40:00 PM | P | PASS |
|
|
Please be in the later afternoon with call to Aleks on way ###-####. Thanks Phone #: ###-#### >> Inspection requested via web by Allie Courter 20# gas test ok, flue test not ready
|
MEC15-00753
| Rough-in | 2/19/2015 | 2/19/2015 | 2/19/2015 3:28:30 PM | P | FAIL |
|
|
Bj 5730755 >> Inspection requested via web by william kerwin dryer duct with 4 elbows is currently 52 feet and the max allowed is 35'.
|
MEC15-00753
| Pressure Test | 2/19/2015 | 2/19/2015 | 2/19/2015 3:27:47 PM | P | PASS |
|
|
Bj 5730755 gate code 1599 >> Inspection requested via web by william kerwin flue tes and 60 lb gas test ok
|
MEC15-00756
| Final | 2/19/2015 | 2/19/2015 | 2/19/2015 2:40:00 PM | P | PASS |
|
|
Thank you! Should be done between 1-3. Phone #: ###-#### >> Inspection requested via web by SOPHIA FLEMING
|
MEC15-00725
| Final | 2/17/2015 | 2/19/2015 | 2/19/2015 2:35:37 PM | P | PASS |
|
|
should be ready by 1pm. Please call James ###-#### when heading out. Thanks! Brenda Phone #: ###-#### >> Inspection requested via web by Brenda St Clair
|
MIS14-00193
| MEC-Conference | 2/18/2015 | 2/19/2015 | 2/19/2015 2:09:31 PM | P | DONE |
|
|
met with heating contractor and building owner to discuss mechanical requirements for downtown hound to occupy.
|
MEC13-05287
| Rough-in | 2/18/2015 | 2/19/2015 | 2/19/2015 11:45:58 AM | A | PASS |
|
|
Pioneer lobby, 6th floor. On site contact: Ben Skelton Phone #: ###-#### Inspection requested via web by Melissa Kaae Ok to cover ceiling in the pioneer room
|