FIR16-00099
| INSP-Final Inspection | 2/19/2016 | 2/19/2016 | 2/19/2016 3:19:58 PM | P | PASS |
|
|
Final fire sprinkler inpsection passed/complete, project address located at 119 Broadway Ave, Boise ID.
|
FIR15-00235
| INSP-Sprinkler Rough-in/Hydro | 2/18/2016 | 2/19/2016 | 2/19/2016 11:23:29 AM | P | PASS |
|
|
hydrostatic test (200psi for 2 hours) passed/complete for underground fire supply main.
|
FIR15-00748
| INSP-Sprinkler Rough-in | 2/17/2016 | 2/19/2016 | 2/19/2016 11:12:42 AM | A | PART |
|
|
Rough to cover inspection complete for 1st and 2nd level, building A-2, overhead fire sprinkler piping approved for cover. Third level rough to cover inspection performed, inspection passed for rough-in, piping on third level cannot be covered until tenting/insulation inspection is completed.
|