ELE19-00617
| Rough-In Permanent Service | 2/19/2019 | 2/19/2019 | 2/19/2019 3:57:02 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by cal crosby p/s u/g n ok
|
ELE19-00398
| Electrical Rough-In | 2/15/2019 | 2/19/2019 | 2/19/2019 3:26:17 PM | P | PASS |
|
|
Pls contact Brad (Foreman) @ ###-#### or Preston (Electrician) @ ###-#### one hr prior or if you have any questions. Thank you. Inspection requested via web by Rob Maes Ok cover UL listing
|
ELE18-02078
| Final | 2/15/2019 | 2/19/2019 | 2/19/2019 3:02:30 PM | A | CANC |
|
|
Jill ###-#### Talked to Jill. She is going to call for a final sometime in the next couple of weeks.
|
ELE18-00956
| Electrical Rough-In | 2/19/2019 | 2/19/2019 | 2/19/2019 2:51:50 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Dean Gernaat Ok cover up and downstairs
|
ELE16-03510
| Final | 2/15/2019 | 2/19/2019 | 2/19/2019 2:34:30 PM | A | PASS |
|
|
Please call Jeff at the above number at least one hour prior to arrival so he can meet you and gain access. Thank you Phone #: ###-#### Inspection requested via web by Winters LLC Ok final to close out permit. Panel labeled.
|
ELE19-00572
| Rough-In Permanent Service | 2/15/2019 | 2/19/2019 | 2/19/2019 2:30:57 PM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by William Andrews p/s u/g n ok
|
ELE18-04764
| Final | 2/19/2019 | 2/19/2019 | 2/19/2019 1:59:57 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Robert Schroder Ok final.
|
ELE19-00415
| Conference | 2/18/2019 | 2/19/2019 | 2/19/2019 1:21:03 PM | A | DONE |
|
|
Would Like To Discuss The Led Lighting Solution Thanks Dave Phone #: ###-#### Inspection requested via web by jason shifflett Asked contractor to verify manu suggested use of all drivers used.
|
ELE19-00416
| Electrical Rough-In | 2/19/2019 | 2/19/2019 | 2/19/2019 1:20:22 PM | P | PASS |
|
|
Only inspect 6'' of underslab PVC before pour. Phone #: ###-#### Inspection requested via web by Taras Shulga Ok cover conduit for kitchen island.
|
ELE18-04425
| Electrical Rough-In | 2/19/2019 | 2/19/2019 | 2/19/2019 12:36:03 PM | P | PASS |
|
|
Need to insulate outside wall in kitchen area Phone #: ###-#### Inspection requested via web by dennis mcneely Ok cover exterior kitchen wall.
|
ELE18-01606
| Electrical Rough-In | 2/15/2019 | 2/19/2019 | 2/19/2019 12:05:02 PM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Stephanie Huston Ok cover exterior walls and ceilings in all units in Bldg D first floor.
|
ELE19-00291
| Final | 2/18/2019 | 2/19/2019 | 2/19/2019 12:03:56 PM | A | PASS |
|
|
We will call in the morning to schedule a time to meet you onsite. Phone #: ###-#### Inspection requested via web by Jesse Simpson Ok final. All labels present.
|
ELE19-00344
| Conference | 2/18/2019 | 2/19/2019 | 2/19/2019 12:03:28 PM | A | DONE |
|
|
Hi Mark- I''m making good progress but I''m afraid I got some bad advice and I think you said you could do another conference. Hopefully nothing major but I''m hoping you can come out and I can just ask you a few questions before I wrap up. Thanks so much. Phone #: ###-#### Inspection requested via web by Brad Christensen Discussed using stackits for multy wire locations, and blocking for wires running between bays.
|
ELE19-00365
| Electrical Rough-In | 2/18/2019 | 2/19/2019 | 2/19/2019 10:49:48 AM | A | PASS |
|
|
There will be a key on the meter. If you have any questions please feel free to contact Darren ###-####. Thanks!! Phone #: ###-#### Inspection requested via web by Clayton Morgan Ok cover kitch, N bed wall and bath.
|