ELE17-03422
| Conference | 2/19/2019 | 2/19/2019 | 2/19/2019 4:00:32 PM | P | PASS |
|
|
discuss inspection process...homeowner called and we discussed what and how inspections go for moving service...asked if 2nd meter could be added to residence for construction...informed homeowner they are able to schedule another conference to go over work done and new srevice location and conversion of existing panel too sub-panel
|
ELE18-00602
| Electrical Rough-In | 2/19/2019 | 2/19/2019 | 2/19/2019 3:40:08 PM | P | PASS |
|
|
John Phone #: ###-####... ceiling in training area and exterior soffits ok to cover
|
ELE19-00188
| Final | 2/19/2019 | 2/19/2019 | 2/19/2019 3:01:47 PM | P | PASS |
|
|
Please call Kaden when you are headed there so he can meet you. ###-#### Phone #: ###-#### Inspection requested via web by William Salts...ok to final
|
ELE18-04530
| Final | 2/19/2019 | 2/19/2019 | 2/19/2019 3:01:01 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by cris flores... job complete...no card to sign...ok to final
|
ELE18-04530
| Electrical Rough-In | 2/19/2019 | 2/19/2019 | 2/19/2019 2:59:43 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by cris flores... ceiling grid ok to cover dwn stairs remodel
|
ELE19-00591
| Temporary Service | 2/19/2019 | 2/19/2019 | 2/19/2019 2:35:45 PM | P | FAIL |
|
|
Call for gate code Phone #: ###-#### Inspection requested via web by Rachael Moore... 1) dead front on all in one needs breaker blank or breaker installed where knock out has been removed 2) 240 volt outlet needs GFCI protection
|
ELE18-04601
| Permanent Service | 2/19/2019 | 2/19/2019 | 2/19/2019 1:53:01 PM | P | PASS |
|
|
service change... p/s o/h reconnect ok
|
ELE18-04601
| Electrical Rough-In | 2/14/2019 | 2/19/2019 | 2/19/2019 1:52:20 PM | P | PASS |
|
|
We need a power to panel inspection for a meter upgrade in order to get the power restored by Idaho Power. Brian McEwen will be on site and can be reached at ###-####. We would like for a 1PM inspection if possible. We also need a rough inspection as well. So two different inspections. Phone #: ###-#### Inspection requested via web by Brecklee Brown... UL listed equipment verified
|
ELE18-03476
| Electrical Rough-In | 2/19/2019 | 2/19/2019 | 2/19/2019 1:26:14 PM | P | CANC |
|
|
Zack Phone #: ###-####... oked by contractor to reschedule to next day AM
|
ELE18-03408
| Final | 2/17/2019 | 2/19/2019 | 2/19/2019 1:15:32 PM | P | FAIL |
|
|
please call 45 minutes before inspection, so we can meet you onsite Phone #: ###-#### Inspection requested via web by Tim Dunlop... 1) exterior outlet shall be installed completely to finished material...back patio 2) GFI in garage shall be readily accessible 6'7" top of box 3) upstairs patio GFI needs properly installed
|
ELE19-00367
| Electrical Rough-In | 2/18/2019 | 2/19/2019 | 2/19/2019 11:37:13 AM | P | PASS |
|
|
Please Call before inspection. Phone #: ###-#### Inspection requested via web by Matt Oranday... spoke with contractor...job was done on day Boise City was closed due to holiday...contractor will meet at final to go over material installed
|
ELE18-02677
| Final | 2/14/2019 | 2/19/2019 | 2/19/2019 11:26:54 AM | P | PASS |
|
|
we went back and put the stickers on every single fixture. painful, but believe we have fulfilled your requirements Phone #: ###-#### Inspection requested via web by Tim Dunlop.. verified..ok to final
|
ELE19-00615
| Electrical Rough-In | 2/18/2019 | 2/19/2019 | 2/19/2019 11:18:06 AM | P | NR |
|
|
consultation for moving electrical boxes Phone #: ###-#### Inspection requested via web by Thomas Bond... conference scheduled will schedule rough inspection when ready
|
ELE19-00615
| Conference | 2/19/2019 | 2/19/2019 | 2/19/2019 11:16:47 AM | P | PASS |
|
|
consultation for moving electrical boxes Phone #: ###-#### Inspection requested via web by Thomas Bond...homeowner has previously done work...consult done at that time and he is confident in doing current work...ok
|
ELE19-00301
| Final | 2/15/2019 | 2/19/2019 | 2/19/2019 11:05:26 AM | P | PASS |
|
|
Contact: Brian Prussia ###-#### Phone #: ###-#### Inspection requested via web by BRS Permitting... labelling, disconnect, and OCPD ok
|
ELE19-00301
| Electrical Rough-In | 2/15/2019 | 2/19/2019 | 2/19/2019 11:04:23 AM | A | PASS |
|
|
Contact: Brian Prussia ###-#### Phone #: ###-#### Inspection requested via web by BRS Permitting... UL listing verified from contractor...job done on day Boise City was closed observing holiday
|
ELE19-00302
| Final | 2/14/2019 | 2/19/2019 | 2/19/2019 10:48:12 AM | A | PASS |
|
|
Contractor: Blue Raven Solar - ###-#### Phone #: ###-#### Inspection requested via web by BRS Permitting... labelling, disconnect, and OCPD ok
|
ELE18-04766
| Final | 2/16/2019 | 2/19/2019 | 2/19/2019 10:33:47 AM | A | FAIL |
|
|
Onsite contact Richard Scown can be paged at Security Desk, and take you to roof where sign can be inspected. Phone #: ###-#### Inspection requested via web by David Baker... 1) no discoonect within site...if breaker for circuit being used a label shall be applied directing where located 2) sealtite shall be strapped within 12" of junction box
|
ELE19-00590
| Electrical Rough-In | 2/18/2019 | 2/19/2019 | 2/19/2019 10:02:30 AM | A | PASS |
|
|
Please call Matt to meet at location. Phone #: ###-#### Inspection requested via web by Bryan Atkins... splitting existing space into two seperate tenant spaces new walls and hardlids ok to cover existing exam rooms wired with redundant ground and hospital grade recps-GFI protection will be added by final GFI protection for existing bathroom needs addressed do to GFI protection located in other tenant space...must be readily accessible
|
ELE18-04422
| Final | 2/15/2019 | 2/19/2019 | 2/19/2019 9:25:28 AM | A | FAIL |
|
|
Contact: Brian Gee Phone #: ###-#### Inspection requested via web by Deb Gooden... 1) all outlets in bedrooms shall have AFCI protection..upstairs bedrooms where rewire was done and all smoke detectors 2) plates on recps and switches shall be installed..multiple place thru out house
|
ELE19-00476
| Final | 2/15/2019 | 2/19/2019 | 2/19/2019 8:31:27 AM | A | FAIL |
|
|
Call for access- Joshua Phone #: ###-####..
unable to final at this time outlets and switches are hanging out of boxes, all plates are removed, and cans not completely installed-unable to verify whats new schedule when all work complete
|
ELE18-04697
| Final | 2/18/2019 | 2/19/2019 | 2/19/2019 8:09:52 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Sherry Allen... ok to final
|
ELE15-02845
| ELE-Aging Inspection | 2/19/2019 | 2/19/2019 | 2/19/2019 7:13:52 AM | | PASS |
|
|
still under construction
|