BLD97-00926
| INSP-Sprinkler Rough-in/Hydro | 2/2/1998 | 2/2/1998 | 2/2/1998 12:00:00 AM | | PASS |
|
|
/ / 406 - OK ON HYDRO TEST
|
BLD97-01013
| INSP-Sprinkler Rough-in/Hydro | 2/2/1998 | 2/2/1998 | 2/2/1998 12:00:00 AM | | PART |
|
|
/ / 406 - OK ON SPKLR ROUGH IN OF AREA BELOW GRID & OK ON HYDRO TEST N
|
BLD97-02408
| INSP-Sprinkler Rough-in/Hydro | 2/2/1998 | 2/2/1998 | 2/2/1998 12:00:00 AM | | PART |
|
|
/ / 406 - OK ON ROUGH IN ANTI FREEZE LOOP CONTROL VALVES MUST BE MONI
|
BLD97-03203
| INSP - Final | 2/2/1998 | 2/2/1998 | 2/2/1998 12:00:00 AM | | PASS |
|
|
/ / 406 - FINAL OK FOR PERM OCC
|
BLD97-03205
| INSP - Final | 2/2/1998 | 2/2/1998 | 2/2/1998 12:00:00 AM | | PASS |
|
|
/ / 406 - FINAL OK FOR PERM OCC
|
BLD97-03205
| INSP-Final Inspection | 1/30/1998 | 2/2/1998 | 2/2/1998 12:00:00 AM | A | NH |
|
|
02/02/98 406 - ###-#### FINAL NO ONE ON SITE DOOR LOCKED
|
BLD97-03203
| INSP-Final Inspection | 1/30/1998 | 2/2/1998 | 2/2/1998 12:00:00 AM | A | NH |
|
|
02/02/98 406 - ###-#### FINAL NO ONE ON SITE DOOR LOCKED
|
BLD97-01986
| INSP-Supply line flush | 2/2/1998 | 2/2/1998 | 2/2/1998 12:00:00 AM | P | PART |
|
|
02/02/98 406 - 1:30-prior arrangement tracy ###-#### OK ON UNDERGROUND FLUSH AND ROUGH IN EXCEPT RISERS
|