Inspections for the day of: Friday, February 2, 2001.
Number of inspections: 10
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorDave Lightfoot
TitleMEC-STR/MEC INSPECTOR
Phone #794-9463
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
MEC01-00102 Rough-in2/1/20012/2/20012/2/2001 12:00:00 AMAPART
Scheduled by a contractor via Hello! on 02/01/2001 at 09:27:51. Contact: ###-####. partial r/i in the pharamacy
MEC01-00325 Rough-in2/1/20012/2/20012/2/2001 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 02/01/2001 at 15:41:30. Contact: ###-####.
MEC01-00316 Final2/1/20012/2/20012/2/2001 12:00:00 AMAPASS
Jerry ###-####
MEC00-02935 Conference2/2/20012/2/20012/2/2001 12:00:00 AMACANC
Added by Inspector: 337 On 2/2/2001 10:56:21 AM
MEC01-00280 Pressure Test2/2/20012/2/20012/2/2001 12:00:00 AMPNH
Scheduled by a contractor via Hello! on 02/02/2001 at 10:42:57. Contact: ###-####.
MEC01-00332 Final2/2/20012/2/20012/2/2001 12:00:00 AMPNH
Scheduled by a contractor via Hello! on 02/02/2001 at 11:17:17. Contact: ###-####.
MEC00-04149 Final2/1/20012/2/20012/2/2001 12:00:00 AMPFAIL
###-#### c/n posted 2/2/2001 2:18:55 PM
MEC01-00223 Rough-in2/2/20012/2/20012/2/2001 12:00:00 AMPFAIL
Scheduled by a contractor via Hello! on 02/02/2001 at 09:15:52. Contact: ###-####. furnace clearance 2/2/2001 2:19:30 PM
MEC01-00223 Pressure Test2/2/20012/2/20012/2/2001 12:00:00 AMPPASS
Scheduled by a contractor via Hello! on 02/02/2001 at 09:16:17. Contact: ###-####.
MEC01-00330 Pressure Test2/2/20012/2/20012/2/2001 12:00:00 AMPPASS
Scheduled by a contractor via Hello! on 02/02/2001 at 10:04:09. Contact: ###-####.