BLD00-03585
| BLD-Foundation | 2/1/2001 | 2/2/2001 | 2/2/2001 12:00:00 AM | A | PART |
|
|
Jed ###-####
|
BLD00-00048
| BLD-Framing/Rough-in | 2/1/2001 | 2/2/2001 | 2/2/2001 12:00:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 02/01/2001 at 16:19:28. Contact: ###-####.ok to sheetrock sofit at front of store ,check stands. 2/2/2001 12:19:04 PM
|
BLD00-02865
| BLD-Framing/Rough-in | 2/1/2001 | 2/2/2001 | 2/2/2001 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 02/01/2001 at 16:23:47. Contact: ###-####.ok for perm oc. 2/2/2001 2:15:02 PM
|
BLD00-03308
| BLD-Framing/Rough-in | 2/1/2001 | 2/2/2001 | 2/2/2001 12:00:00 AM | A | PASS |
|
|
Rocky 3714689ok to sheetrock. 2/2/2001 10:31:17 AM
|
BLD00-01836
| BLD-Final | 2/1/2001 | 2/2/2001 | 2/2/2001 12:00:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 02/01/2001 at 17:01:15. Contact: ###-####.ok for temp oc ,still requires other signatures on job card for for perm oc,all signed for temp ,c/n also for s-i reoprt and engineersfinal letter of acceptance,also complete concrete ateast side exit door setting forms at this time. 2/2/2001 11:13:59 AM 2/2/2001 11:14:24 AM
|
BLD00-03231
| BLD-Final | 2/1/2001 | 2/2/2001 | 2/2/2001 12:00:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 02/01/2001 at 17:02:19. Contact: ###-####.ok for temp oc. 2/2/2001 11:14:52 AM
|
MEC01-00308
| Rough-in | 2/2/2001 | 2/2/2001 | 2/2/2001 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 02/02/2001 at 08:50:08. Contact: ###-####.
|
MEC01-00308
| Pressure Test | 2/2/2001 | 2/2/2001 | 2/2/2001 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 02/02/2001 at 08:50:28. Contact: ###-####.
|
MIS01-00011
| BLD-Final | 2/2/2001 | 2/2/2001 | 2/2/2001 12:00:00 AM | P | NR |
|
|
###-#### craig late pm please last one if possible
|
BLD00-01979
| BLD-Framing/Rough-in | 2/2/2001 | 2/2/2001 | 2/2/2001 12:00:00 AM | P | PART |
|
|
Added by Inspector: 407 On 2/2/2001 3:31:35 PM need fireblocking at front coluns.
|
BLD00-03540
| BLD-Framing/Rough-in | 2/1/2001 | 2/2/2001 | 2/2/2001 12:00:00 AM | P | FAIL |
|
|
###-####c/n posted. 2/2/2001 4:15:09 PM
|
BLD00-03463
| BLD-Framing/Rough-in | 2/1/2001 | 2/2/2001 | 2/2/2001 12:00:00 AM | P | PART |
|
|
Scheduled by a contractor via Hello! on 02/01/2001 at 09:11:33. Contact: ###-####.c/n posted for support and complete front entrance. 2/2/2001 2:14:23 PM
|
BLD00-03328
| BLD-Final | 2/1/2001 | 2/2/2001 | 2/2/2001 12:00:00 AM | P | PART |
|
|
###-####all ok'd for perm oc except,signed temp,as/c/n need lateral braces at grid ceiling. 2/2/2001 2:13:32 PM
|