BLD00-03328
| FIRE-Final Inspection | 2/1/2001 | 2/2/2001 | 2/2/2001 12:00:00 AM | A | PASS |
|
|
###-####
|
FIR00-00672
| INSP-Sprinkler Rough-in | 2/1/2001 | 2/2/2001 | 2/2/2001 12:00:00 AM | A | PART |
|
|
###-#### okay to cover east stair only. 2/2/2001 2:38:58 PM
|
BLD00-03497
| FIRE-Final Inspection | 2/2/2001 | 2/2/2001 | 2/2/2001 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 02/02/2001 at 08:24:15. Contact: ###-####.
|
BLD00-01590
| FIRE-Final Inspection | 2/2/2001 | 2/2/2001 | 2/2/2001 12:00:00 AM | P | PASS |
|
|
building is left open Pete ###-####
|
BLD00-02037
| FIRE-Final Inspection | 2/2/2001 | 2/2/2001 | 2/2/2001 12:00:00 AM | P | NR |
|
|
###-#### contractor said the sprinklers aren't ready, not tied into the main feed 2/2/2001 3:39:27 PM
|
BLD00-03524
| FIRE-Final Inspection | 2/2/2001 | 2/2/2001 | 2/2/2001 12:00:00 AM | P | PASS |
|
|
Scheduled by Inspector: 409 On 2/2/2001 2:32:05 PM
|
FIR00-00672
| INSP-Supply line flush | 2/2/2001 | 2/2/2001 | 2/2/2001 12:00:00 AM | P | PASS |
|
|
Scheduled by Inspector: 409 On 2/2/2001 2:34:03 PM
|
FIR00-00672
| INSP-Sprinkler Rough-in/Hydro | 2/2/2001 | 2/2/2001 | 2/2/2001 12:00:00 AM | P | PART |
|
|
Scheduled by Inspector: 409 On 2/2/2001 2:39:27 PM supply line and dry standpipe hydro okay 2/2/2001 2:40:01 PM
|