MEC04-00224
| Final | 1/30/2004 | 2/2/2004 | 2/2/2004 12:00:00 AM | A | PASS |
|
|
###-#### Dale
|
MEC04-00289
| Rough-in | 1/30/2004 | 2/2/2004 | 2/2/2004 12:00:00 AM | A | PASS |
|
|
a-1 fireplace- ###-####
|
BLD03-00781
| BLD-Framing/Rough-in | 1/31/2004 | 2/2/2004 | 2/2/2004 12:00:00 AM | A | PART |
|
|
B wing bracing; Phone #: ###-#### Internet Inspection Request from: Wayne Coleman Frame insp C wing (North side) OK.... Detail 5/20 Beam/wall truss/blocking detail Room 105 OK with Eng OK for some blocking flat to allow for conduit. 2/2/2004 9:21:58 AM
|
BLD03-02241
| BLD-Conference | 2/2/2004 | 2/2/2004 | 2/2/2004 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 2/2/2004 at 8:17:36 AM. Contact: ###-####.
|
BLD03-02785
| BLD-Energy code compliance | 2/2/2004 | 2/2/2004 | 2/2/2004 12:00:00 AM | P | PASS |
|
|
###-#### brian Please call for access Frame OK 2/2/2004 3:47:45 PM
|
BLD03-02788
| BLD-Energy code compliance | 2/2/2004 | 2/2/2004 | 2/2/2004 12:00:00 AM | P | PASS |
|
|
###-#### brian 2/2/2004 3:47:52 PM Frame OK. 2/2/2004 3:48:08 PM
|
BLD03-02784
| BLD-Energy code compliance | 2/2/2004 | 2/2/2004 | 2/2/2004 12:00:00 AM | P | PASS |
|
|
###-#### Frame OK. 2/2/2004 3:48:21 PM
|
BLD03-02787
| BLD-Energy code compliance | 2/2/2004 | 2/2/2004 | 2/2/2004 12:00:00 AM | P | PASS |
|
|
###-#### brian Frame OK. 2/2/2004 3:48:35 PM
|
MEC03-02725
| Final | 2/2/2004 | 2/2/2004 | 2/2/2004 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 2/2/2004 at 10:39:01 AM. Contact: ###-####.
|
BLD03-02319
| BLD-Final | 1/30/2004 | 2/2/2004 | 2/2/2004 12:00:00 AM | P | CANC |
|
|
Scheduled by a contractor via Hello! on 1/30/2004 at 2:28:08 PM. Contact: ###-####.
|
BLD03-02109
| BLD-Final | 1/30/2004 | 2/2/2004 | 2/2/2004 12:00:00 AM | P | PASS |
|
|
Wayne; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes C/C issued. 2/2/2004 3:32:59 PM
|