Inspections for the day of: Monday, February 2, 2004.
Number of inspections: 5
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorJim Johnson
TitlePLM-INSPECTOR
Phone #794-9476
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
PLM04-00215 Water and/or Sewer1/30/20042/2/20042/2/2004 12:00:00 AMACANC
swr line- rob ###-####--already done per bill
PLM03-02411 Final1/31/20042/2/20042/2/2004 12:00:00 AMAPART
Scheduled by a contractor via Hello! on 1/31/2004 at 10:24:54 AM. Contact: ###-####.need to finish labling non potable water system and raise spill-proof pressure vacuum breaker up higher by mop sink oked temp 2/2/2004 11:50:14 AM
PLM03-03087 Final2/2/20042/2/20042/2/2004 12:00:00 AMPPASS
charlie; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie final pass for north side of hall way 2/2/2004 1:31:20 PM
PLM03-02447 Final1/30/20042/2/20042/2/2004 12:00:00 AMPPART
Scheduled by a contractor via Hello! on 1/30/2004 at 9:32:06 AM. Contact: ###-####. in unit 1724- need to finish trim for tub waste and overflow unit 1722 need to pipe t&p over drain in washer box oked temp 2/2/2004 2:37:41 PM
PLM03-03906 Final1/30/20042/2/20042/2/2004 12:00:00 AMPPART
Scheduled by a contractor via Hello! on 1/30/2004 at 9:34:20 AM. Contact: ###-####. in unit 1724 need to finish trim for waste and overflow on tub in unit 1722 need to pipe t&p over drain in washer box oked temp 2/2/2004 2:39:46 PM