ESC03-01546
| BMP Violation | 1/30/2004 | 2/2/2004 | 2/2/2004 12:00:00 AM | P | PART |
|
|
Verbal to rp J. Walker--###-####. Sweeping of dirt from street and sidewalk unacceptable. Need to re-do. Will follow up. 2/2/2004 2:26:37 PM
|
ESC03-00445
| BMP Violation | 1/30/2004 | 2/2/2004 | 2/2/2004 12:00:00 AM | P | PASS |
|
|
|
ESC03-01008
| BMP Violation | 1/30/2004 | 2/2/2004 | 2/2/2004 12:00:00 AM | P | FAIL |
|
|
Verbal correction to rp B. Campbell--###-#### or ###-####. Maintain bmp's including construction entrance, d.i. sweep dirt at curb. Port-a-pot tiped over. Complete by end of day 2/3/04 or stop work can be issued. 2/2/2004 2:13:36 PM
|
ESC03-01470
| Site Preparation | 1/30/2004 | 2/2/2004 | 2/2/2004 12:00:00 AM | P | FAIL |
|
|
C/N issued--complete by end of the day on 2/3/04 or a stop work can be issued. Robert RP ###-#### 2/2/2004 1:46:01 PM
|
ESC03-00332
| Site Preparation | 1/30/2004 | 2/2/2004 | 2/2/2004 12:00:00 AM | P | PASS |
|
|
Jersey barricade in place on north side of construction area to prevent mud track out. 2/2/2004 4:07:38 PM
|