MEC03-03686
| Final | 1/30/2004 | 2/2/2004 | 2/2/2004 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 1/30/2004 at 4:22:58 PM. Contact: ###-####.
|
MEC03-02087
| Final | 1/31/2004 | 2/2/2004 | 2/2/2004 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 1/31/2004 at 10:26:10 AM. Contact: ###-####.
|
MEC03-02335
| Final | 2/2/2004 | 2/2/2004 | 2/2/2004 12:00:00 AM | A | PASS |
|
|
Verified letter from designer that no oil heaters are to be installed at this time. No permanent Hotsy washer installed at this time per Contractor. Mechanical permit requied when these equipment are installed.
|
BLD03-02402
| BLD-Conference | 2/2/2004 | 2/2/2004 | 2/2/2004 12:00:00 AM | P | CANC |
|
|
Tim; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes
Contractor to reschedule with Russ. 2/2/2004 2:13:57 PM
|
BLD03-01197
| BLD-Final | 1/30/2004 | 2/2/2004 | 2/2/2004 12:00:00 AM | P | CANC |
|
|
Scheduled by a contractor via Hello! on 1/30/2004 at 2:16:41 PM. Contractor to reschedule for tomorrow afternoon. 2/2/2004 2:42:59 PM
|
BLD03-00584
| BLD-Framing/Rough-in | 2/2/2004 | 2/2/2004 | 2/2/2004 12:00:00 AM | P | FAIL |
|
|
john; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
Need seal package, bracing to truss BR and toe nailing to joist hangers. 2/2/2004 2:07:27 PM
|
BLD03-02197
| BLD-Final | 2/2/2004 | 2/2/2004 | 2/2/2004 12:00:00 AM | P | PASS |
|
|
curt; Phone #: ###-#### Internet Inspection Request from: Annette Moore
|
BLD03-02200
| BLD-Final | 2/2/2004 | 2/2/2004 | 2/2/2004 12:00:00 AM | P | PASS |
|
|
curt ; Phone #: ###-#### Internet Inspection Request from: Annette Moore
|
BLD03-01851
| BLD-Framing/Rough-in | 2/2/2004 | 2/2/2004 | 2/2/2004 12:00:00 AM | P | FAIL |
|
|
Craig; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes
Shear wall inspection not complete too many areas not nailed off. Informed contractor not to install anymore felt on roof without naiing inspection complete. 2/2/2004 4:08:20 PM
|