Inspections for the day of: Wednesday, February 2, 2005.
Number of inspections: 9
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorJim Johnson
TitlePLM-INSPECTOR
Phone #794-9476
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
PLM04-03199 Water and/or Sewer2/1/20052/2/20052/2/2005 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 2/1/2005 at 12:30:37 PM. Contact: ###-####. water line to building test ok ok to cover 2/2/2005 9:50:40 AM
PLM04-03199 Roof Drains2/1/20052/2/20052/2/2005 12:00:00 AMAPART
Scheduled by a contractor via Hello! on 2/1/2005 at 12:31:05 PM. Contact: ###-####. roof drain,s on north side of building test ok overflow drain,s and roof drain,s on south side of building to be tested at a later date 2/2/2005 9:53:00 AM
PLM04-00501 Final2/1/20052/2/20052/2/2005 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 2/1/2005 at 4:24:34 PM. Contact: ###-####.
PLM04-03674 Plumbing Rough-in2/1/20052/2/20052/2/2005 12:00:00 AMPPASS
Scheduled by a contractor via Hello! on 2/1/2005 at 5:17:23 PM. Contact: ###-####.
PLM05-00256 Plumbing Rough-in2/2/20052/2/20052/2/2005 12:00:00 AMPPASS
leo; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
PLM05-00301 Sprinkler (Final)2/2/20052/2/20052/2/2005 12:00:00 AMPPASS
george ###-####
PLM05-00302 Sprinkler (Final)2/2/20052/2/20052/2/2005 12:00:00 AMPPART
george ###-#### tie in ok -ok to cover need to raise PVB minimum of 12 inches above all down stream piping contracto to recall when ready 2/2/2005 2:33:14 PM
PLM04-03199 Roof Drains2/2/20052/2/20052/2/2005 12:00:00 AMPPASS
all overflow,s and south side roof drains test ok 2/2/2005 2:09:56 PM
PLM05-00282 Plumbing Rough-in1/31/20052/2/20052/2/2005 12:00:00 AMPNH
Frank; Phone #: ###-#### Internet Inspection Request from: Jan Rice not home no access 2/2/2005 4:32:22 PM