BLD04-00079
| BLD-Framing/Rough-in | 2/1/2005 | 2/2/2005 | 2/2/2005 12:00:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 2/1/2005 at 4:23:02 PM. Contact: ###-####. stair tower idaho street side first layer shafthwall repair ok 2thru 6th floor ok to cover 2/2/2005 10:52:58 AM
|
BLD02-00266
| BLD-Conference | 2/2/2005 | 2/2/2005 | 2/2/2005 12:00:00 AM | A | CANC |
|
|
|
BLD04-01783
| BLD-Final | 2/1/2005 | 2/2/2005 | 2/2/2005 12:00:00 AM | A | NR |
|
|
Scheduled by a contractor via Hello! on 2/1/2005 at 7:39:23 AM. Contact: ###-####. needs plumbing final 2/2/2005 12:20:35 PM
|
MIS05-00016
| BLD-Final | 2/1/2005 | 2/2/2005 | 2/2/2005 12:00:00 AM | P | PASS |
|
|
tim bergey --###-#### ok for perm occ 2/2/2005 3:19:41 PM
|
MEC05-00334
| Pressure Test | 1/31/2005 | 2/2/2005 | 2/2/2005 12:00:00 AM | P | PASS |
|
|
dana ###-####
|
BLD03-01830
| BLD-Framing/Rough-in | 2/2/2005 | 2/2/2005 | 2/2/2005 12:00:00 AM | P | PART |
|
|
this is in the basement bathroom please///paul; Phone #: ###-#### Internet Inspection Request from: Barbara Moore restrooms in basement ok to cover 2/2/2005 1:55:00 PM
|
BLD02-00266
| BLD-Final | 2/2/2005 | 2/2/2005 | 2/2/2005 12:00:00 AM | P | PASS |
|
|
inspection for occ ok for perm occ dave had carles c/n we went tough all the items and I walked the project allc/n items comlpted 2/2/2005 1:39:50 PM
|
BLD02-00266
| BLD-Final | 2/2/2005 | 2/2/2005 | 2/2/2005 12:00:00 AM | P | DONE |
|
|
inspection for occ
|