MIS05-00052
| MIS-Aging Inspection | 2/2/2006 | 2/2/2006 | 2/2/2006 4:46:20 PM | | PASS |
|
|
Permit issued.....Bld05-01141
|
BLD05-02324
| BLD-Framing/Rough-in | 2/1/2006 | 2/2/2006 | 2/2/2006 4:35:01 PM | P | PASS |
|
|
Robert; Phone #: ###-#### Internet Inspection Request from: Elizabeth Esong
|
BLD05-02641
| BLD-Footing | 2/1/2006 | 2/2/2006 | 2/2/2006 3:35:52 PM | P | NR |
|
|
Matt; Phone #: ###-#### Internet Inspection Request from: Elizabeth Esong Need new soils Eng. report and approval for subgrade of NEW excavated areas. Spoke with Terry R on this matter. Concrete sub Contr to advise Builder. Conc sub Contr called and said the previously excavated area was very wet and muddy.
|
BLD05-02841
| BLD-Energy code compliance | 2/1/2006 | 2/2/2006 | 2/2/2006 3:31:37 PM | A | PASS |
|
|
Scott; Phone #: ###-#### Internet Inspection Request from: Elizabeth Esong
|
BLD05-02280
| BLD-Framing/Rough-in | 2/1/2006 | 2/2/2006 | 2/2/2006 3:31:08 PM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 2/1/2006 at 5:54:30 PM. Contact: ###-####.
|
BLD04-03010
| BLD-Final | 2/1/2006 | 2/2/2006 | 2/2/2006 3:30:16 PM | A | PART |
|
|
Scheduled by a contractor via Hello! on 2/1/2006 at 8:41:32 AM. Contact: ###-####. OK for Temp Occ..... OK for Perm Occ when Code Enforce Perms.
|
BLD05-03008
| BLD-Conference | 2/1/2006 | 2/2/2006 | 2/2/2006 10:27:06 AM | A | PASS |
|
|
mike ; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa
|
BLD04-02470
| BLD-Energy code compliance | 2/1/2006 | 2/2/2006 | 2/2/2006 10:26:35 AM | A | PART |
|
|
Clint; Phone #: ###-#### Internet Inspection Request from: Elizabeth Esong Frame and Energy OK......1st 2 office spaces....starting from S end of Bldg
|