Inspections for the day of: Monday, February 2, 2009.
Number of inspections: 14
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorClint A Smith
TitleEROSION CONTROL INSPECTOR
Phone #794-8996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC09-00023 Site Preparation2/2/20092/2/20092/2/2009 3:50:55 PM PASS
ESC04-00379 Site Final2/2/20092/2/20092/2/2009 3:50:23 PMPPASS
ESC04-00213 Site Final2/2/20092/2/20092/2/2009 3:50:07 PMPPASS
ESC07-00803 Site Final2/2/20092/2/20092/2/2009 3:49:48 PMPPASS
ESC07-00987 General Inspection2/2/20092/2/20092/2/2009 3:33:13 PMPPASS
Added two additional construction entrance and a stabilized parking area for all workers.
ESC07-00789 Tracking Control1/30/20092/2/20092/2/2009 3:32:07 PMAFAIL
Left message with RP:
Correction Notice:
1.Re-install wattle alonog the sidewalk of the pool.
2. Clean up all hard surface of all sediment and debris.
3. Maintain all storm drain inlets.
4. Post ESC sign at the front of the project.
Failure to comply with the given time frame will result in a stop work order. Will re-inspect on 2/4/09 AM.
ESC08-00658 BMP Violation1/29/20092/2/20092/2/2009 2:04:03 PMAFAIL
Spoke with RP: he will have all wattles installed correctly by 2/4/09 AM. Will Re-inspect on 2/5/09 AM
ESC08-00464 Site Final2/2/20092/2/20092/2/2009 11:28:18 AMADONE
Went over the requiremnets to reach the "final stabilization" with the city requirements. Also gave him an understanding of the guideline of the Federal requirements to file there NOT. Will re-inspect 2 months from now to see if the hydro-seeding has establish growth to meet the requirements for a final.
ESC08-00516 General Inspection ESC2/2/20092/2/20092/2/2009 10:03:46 AM FAIL
Verbal Correction to RP:
Clean up all hard surfaces of all sediment and debris by 2/4/09 PM. Also maintain storm drain inlet within the parking lot. Will re-inspect on 2/5/09 AM
ESC09-00019 General Inspection1/30/20092/2/20092/2/2009 9:29:55 AMAPASS
Went over the scope of work with the contractor. Also did a infield training with Eric Strole over stream bank crossing pertaining with erosion and sediment control.
ESC09-00019 Site Preparation2/2/20092/2/20092/2/2009 8:26:00 AM CANC
ESC04-00324 Site Final2/2/20092/2/20092/2/2009 8:25:09 AMAPASS
ESC04-00673 Site Final2/2/20092/2/20092/2/2009 8:24:53 AMAPASS
ESC07-00214 Site Final2/2/20092/2/20092/2/2009 8:20:05 AMAPASS