FIR03-00471
| INSP-Final Inspection | 2/2/2010 | 2/2/2010 | 2/9/2010 4:27:54 PM | P | PASS |
|
|
Permit finaled, okay per subsequent work.
|
BLD10-00113
| FIRE-Final Inspection | 2/1/2010 | 2/2/2010 | 2/2/2010 6:06:56 PM | P | PASS |
|
|
Fire life safety inspection passed, manual thumbturn lock at the SE kitchen door removed while on site.
|
FIR09-00536
| INSP-Sprinkler Rough-in | 2/1/2010 | 2/2/2010 | 2/2/2010 3:08:18 PM | P | PART |
|
|
Tenting for cold cavity protection of wet system piping at the library room is satisfactory. Discussed inspection schedule for insulation fill at this area to meet NFPA 13 exceptions.
|
BLD08-02063
| FIRE-Final Inspection | 2/2/2010 | 2/2/2010 | 2/2/2010 3:04:31 PM | P | PASS |
|
|
Fire life safety finaled, see previous activity notes.
|
BLD09-02176
| FIRE-Final Inspection | 2/2/2010 | 2/2/2010 | 2/2/2010 3:03:20 PM | A | NR |
|
|
|
BLD08-01071
| FIRE-Final Inspection | 2/2/2010 | 2/2/2010 | 2/2/2010 3:03:00 PM | A | PART |
|
|
Two unfinished units at this time.
|
BLD09-02031
| FIRE-Final Inspection | 2/2/2010 | 2/2/2010 | 2/2/2010 3:01:24 PM | A | NR |
|
|
Discussed fire code review issues and duct detector requirements for HVAC units over 2,000 cfm.
|
FIR09-00721
| INSP-Conference | 2/2/2010 | 2/2/2010 | 2/2/2010 2:56:53 PM | A | DONE |
|
|
Regarding as-builts for necessary field modifications.
|