Inspections for the day of: Tuesday, February 2, 2010.
Number of inspections: 7
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorClint A Smith
TitleEROSION CONTROL INSPECTOR
Phone #794-8996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC09-00710 Site Preparation1/26/20102/2/20102/3/2010 8:31:55 AMANR
ESC10-00010 General Inspection1/26/20102/2/20102/2/2010 4:16:13 PMAPART
Verbal to RP:
Prior to th start of activity, need to maintain construction exit an add additional exit where needed to miniumize thack out. Will follow up in the near future.
ESC09-00808 BMP Violation2/1/20102/2/20102/2/2010 2:44:20 PMPFAIL
Verbal to RP:
Continue the sweeping of the hardsurfaces throughout the project area. Also place all trash debris into the containers that are provided.

Also show and discussed with the RP ovver the federal requirements of the CGP and how that have disturbed over an acre and how they are in a "part of a larger commen plan of developement or sale". Explained to him over how achieve compliance per the Federal Requirements.

Will re-inspect on 2/4/10 PM.
ESC09-00812 Conference2/2/20102/2/20102/2/2010 2:39:38 PMPDONE
Went over conditions with Wendy L. from parks and rec and Walter from MacCalvain Contsruction.
explained what requirements need to occur prior, during and post construction.
Prior to any dewaterinf a Site preperation inspection must be scheduled with the Erosion Control Dept. with the city to inspect and approved all BMP's pertaining to dewatering and construction activity.
During Dewatering opperations Daily water samples are required with a weekly report submitted to Steve Webb with the city Erosion Control dept. Also prior to the structural fill occurs with the pond another site preperation inspection is required to be scheduled to inspect all BMP's and approved. Also a confrence is required to outline the phase of work. At the end of the project final stabilization must occur on all denuded soil per instustry standards. Will follow up with a site prep inspection once secheduled by the permitee or on 2/09/10.
MIS10-00016 DOC - Permit Finaled2/2/20102/2/20102/2/2010 8:57:33 AMPPASS
ESC10-00054 Site Preparation2/2/20102/2/20102/2/2010 8:52:24 AM PASS
ESC09-00720 Site Preparation2/1/20102/2/20102/2/2010 8:41:13 AMAPASS
Referred RP to the a type of product that would work for the drain inlets that he can not pull up for his inlet protection.