FIR11-00674
| INSP-Final Inspection | 2/2/2012 | 2/2/2012 | 2/2/2012 3:10:57 PM | P | PASS |
|
|
permit finaled
|
BLD04-02149
| FIRE-Final Inspection | 2/2/2012 | 2/2/2012 | 2/2/2012 11:40:23 AM | P | PASS |
|
|
Life safety passed
|
FIR11-00563
| INSP-Sprinkler Rough-in/Hydro | 2/1/2012 | 2/2/2012 | 2/2/2012 10:49:16 AM | A | PASS |
|
|
The resident rooms for the first floor, west end, as marked on the plans are ok to cover. This does not include the corridor stand pipe supply due to the earth quake bracing not being complete.
|
FIR11-00480
| INSP-Final Inspection | 2/1/2012 | 2/2/2012 | 2/2/2012 10:46:08 AM | A | PASS |
|
|
Permit finaled
|
BLD11-02155
| FIRE-Final Inspection | 2/1/2012 | 2/2/2012 | 2/2/2012 9:38:02 AM | A | PASS |
|
|
life safety passed
|
FIR12-00014
| INSP-Sprinkler Rough-in | 2/1/2012 | 2/2/2012 | 2/2/2012 9:18:04 AM | A | PASS |
|
|
Sprinkler piping is ok to cover.
|