ESC15-00228
| Aging Inspection | 2/2/2016 | 2/2/2016 | 2/3/2016 4:22:21 PM | | PASS |
|
|
WIP on pool and backyard area. Temp BMP wattle installed. No trackout or runoff issues
|
ESC13-01279
| General Inspection | 2/2/2016 | 2/2/2016 | 2/3/2016 4:15:41 PM | | PASS |
|
|
WIP on homes in Harris Crossing. Street sweeper doing routine cleaning at time of inspection. Concrete washout is lined and designated, no leaks or spills.
Individual houses covered by seperate ESC permits. Need to make sure alley way DIs have inlet protection. Approved.
|
ESC15-01529
| Site Preparation | 2/2/2016 | 2/2/2016 | 2/2/2016 4:03:41 PM | P | CANC |
|
|
rescheduled
|
ESC15-01376
| Site Preparation | 2/1/2016 | 2/2/2016 | 2/2/2016 3:29:51 PM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Weston Wagner
BMPs installed and regular housekeeping occuring in DHE. Approved.
|
ESC15-01378
| Site Preparation | 2/1/2016 | 2/2/2016 | 2/2/2016 3:29:27 PM | A | PASS |
|
|
Austin Phone #: ###-####
BMPs installed and regular housekeeping occuring in DHE. Approved.
|
ESC15-00623
| General Inspection | 2/2/2016 | 2/2/2016 | 2/2/2016 2:57:00 PM | | PASS |
|
|
BMPs installed properly. WIP with regular housekeeping. Approved.
|
ESC15-00006
| General Inspection | 2/2/2016 | 2/2/2016 | 2/2/2016 2:12:17 PM | | PEND |
|
|
All major construction and landscaping is complete. Need to do final sweeping and removal on MS4 inlet protect down the street.
|
ESC15-00417
| Aging Inspection | 2/2/2016 | 2/2/2016 | 2/2/2016 2:06:04 PM | | PASS |
|
|
No sediment leaving site. Unclear if work will resume in spring time....will continue to monitor.
|
ESC15-01213
| General Inspection | 2/2/2016 | 2/2/2016 | 2/2/2016 11:19:27 AM | P | PASS |
|
|
WIP @ North End Pizza. Construction activity on the interior. Yellow permit sign posted and sidewalk and gutter are clean. No trackout or spills in alley.
|
ESC15-00705
| Random Inspection | 2/2/2016 | 2/2/2016 | 2/2/2016 10:57:55 AM | P | PASS |
|
|
Rock retaining wall is installed. Disturbed area above wall is still vegetating. Will continue to monitor for revegetation. No sediment leaving site.
|
ESC16-00073
| Site Preparation | 2/1/2016 | 2/2/2016 | 2/2/2016 10:40:02 AM | A | PASS |
|
|
Shane-10:30 AM Phone #: ###-####
Retaining wall to be built in vegetated backyard. Materials will be taken by tractor around the right of the house. Heavy compost wattle installed along front for any incidental stockpiling and disturbed area by tractor. Approved for construction.
|
ESC15-00701
| General Inspection | 2/2/2016 | 2/2/2016 | 2/2/2016 10:09:14 AM | | PASS |
|
|
Work occuring on the interior. Permit sign posted in window. Parking/staging area is clean and free of loose sediment and debris. No corrections needed.
|
ESC15-01490
| Conference | 2/1/2016 | 2/2/2016 | 2/2/2016 9:39:56 AM | A | PASS |
|
|
Jay Phone #: ###-####
Approved for excavation. Small building addition within paved area. Daily sweeping and housekeeping is main BMP per Jay. Flat, low risk site.
|
ESC15-00691
| General Inspection | 2/2/2016 | 2/2/2016 | 2/2/2016 8:53:05 AM | | PASS |
|
|
WIP on condo units. Frames are up, work occuring on the interior. No trackout to Walling or Warm Springs. No discharges.
|
ESC15-00690
| General Inspection | 2/2/2016 | 2/2/2016 | 2/2/2016 8:52:55 AM | | PASS |
|
|
WIP on condo units. Frames are up, work occuring on the interior. No trackout to Walling or Warm Springs. No discharges.
|