ELE16-03899
| Electrical Rough-In | 2/2/2017 | 2/2/2017 | 2/2/2017 11:51:54 AM | P | PASS |
|
|
under tile floor heat in master bathroom Phone #: ###-#### Inspection requested via web by steve sellers floor heat ok cover
|
ELE16-03686
| Final | 2/2/2017 | 2/2/2017 | 2/2/2017 11:27:22 AM | P | PASS |
|
|
home owner will be home. Phone #: ###-#### Inspection requested via web by steve sellers Kitchen final ok
|
ELE16-02886
| Conference | 2/1/2017 | 2/2/2017 | 2/2/2017 11:08:30 AM | A | DONE |
|
|
Consultation requested around 10am if possible. Please call me. This regarding the homeowner wanting to move/add a dual meter pack now AFTER I was instructed to separate them to 2 for townhouse scenario after having the dual orignarly mounted. Phone #: ###-#### Inspection requested via web by David McClellan Talked about previous discussions about service disconnect locations
|
ELE16-02886
| Electrical Rough-In | 2/1/2017 | 2/2/2017 | 2/2/2017 11:06:12 AM | A | PASS |
|
|
Heated bathroom floor rough-in on north side unit. Phone #: ###-#### Inspection requested via web by David McClellan ok cover
|
ELE16-04097
| Electrical Rough-In | 2/1/2017 | 2/2/2017 | 2/2/2017 9:52:30 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Therrin Robertson ok cover
|
ELE17-00146
| Electrical Rough-In | 2/1/2017 | 2/2/2017 | 2/2/2017 8:47:12 AM | A | PASS |
|
|
jeremy Phone #: ###-#### ok cover panel wall
|
ELE17-00245
| Temporary Service | 2/1/2017 | 2/2/2017 | 2/2/2017 8:32:39 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Darryn Coburn t/s u/g n ok
|