BLD17-03247
| BLD-Final | 1/31/2018 | 2/1/2018 | | P | |
|
|
Byron Phone #: ###-####
|
BLD17-01305
| BLD-Final | 1/31/2018 | 2/1/2018 | | P | |
|
|
Byron Phone #: ###-####
|
BLD17-02960
| BLD-Final | 1/31/2018 | 2/1/2018 | | P | |
|
|
Byron Phone #: ###-####
|
BLD16-02752
| BLD-Other | 2/2/2018 | 2/2/2018 | 2/2/2018 2:31:21 PM | P | PASS |
|
|
Fire rating at roof eave. Phone #: ###-#### Inspection requested via web by Sam Brown
|
BLD17-04305
| BLD-Footing | 2/1/2018 | 2/2/2018 | 2/2/2018 2:04:59 PM | P | PASS |
|
|
Phone #: 2089495359 >> Inspection requested via mobile web by Ricardo
|
BLD17-02415
| BLD-Framing/Rough-in | 2/1/2018 | 2/2/2018 | 2/2/2018 2:04:44 PM | P | NR |
|
|
Phone #: ###-#### Inspection requested via web by David Scaggs. Needs fire sprinkler rough in inspection.
|
BLD17-02411
| BLD-Energy code compliance | 2/2/2018 | 2/2/2018 | 2/2/2018 1:15:03 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by David Scaggs
|
BLD16-04308
| BLD-Final | 2/2/2018 | 2/2/2018 | 2/2/2018 1:14:51 PM | P | CANC |
|
|
Phone #: ###-#### Inspection requested via web by David Scaggs
|
BLD17-02156
| BLD-Final | 2/1/2018 | 2/2/2018 | 2/2/2018 1:14:18 PM | P | PASS |
|
|
BRUCE Phone #: ###-####. Ok for Temp. occ. Will be ok for perm occ. once zoning and fire sign perm.
|
BLD18-00121
| BLD-Final | 2/2/2018 | 2/2/2018 | 2/2/2018 1:13:34 PM | P | PASS |
|
|
|
BLD17-02428
| BLD-Footing | 2/2/2018 | 2/2/2018 | 2/2/2018 1:13:10 PM | P | DEFR |
|
|
Interior footings, concrete is scheduled for 1pm Phone #: ###-#### Inspection requested via web by Marty Short. Concrete already placed when on site.
|
BLD16-04308
| BLD-Final | 2/1/2018 | 2/2/2018 | 2/2/2018 11:45:18 AM | A | PART |
|
|
Please accommodate a 10:30 inspection. Fire final is scheduled for 10 o''clock. Phone #: ###-#### Inspection requested via web by David Scaggs. Ok for temp occ. Needs to provide 5/8 type x rock at HVac ductwork in garage and repair 1 hr. walls.
|
BLD17-01449
| BLD-Final | 2/1/2018 | 2/2/2018 | 2/2/2018 10:03:18 AM | A | PART |
|
|
BYRON - Phone #: ###-####. Temp on shell and core until plumbing, elec. and life safety final. All listed trades have given temp. Contractor to repair holes and mark 3hr. fire barrier walls.
|
BLD17-03247
| BLD-Final | 2/1/2018 | 2/2/2018 | 2/2/2018 10:01:35 AM | A | PART |
|
|
BYRON Phone #: ###-####. Ok for temp occ.
|
BLD18-00121
| BLD-Final | 2/1/2018 | 2/2/2018 | 2/2/2018 9:31:21 AM | A | PEND |
|
|
In front of Macy''s // Troy Phone #: ###-####. Will be ok for occ. once electrical signs pem.
|
BLD17-02932
| BLD-Framing/Rough-in | 2/1/2018 | 2/2/2018 | 2/2/2018 8:59:37 AM | A | CANC |
|
|
ED SLOAN Phone #: ###-####. Needs electrical rough in inspection and airseal pack .
|
BLD17-03128
| BLD-Foundation | 2/1/2018 | 2/2/2018 | 2/2/2018 8:59:03 AM | A | CANC |
|
|
DARYL - THEY ARE PLANNING ON POURING AT NOON SO THE EARLIER THE BETTER - PLEASE Phone #: ###-####
|
BLD17-03128
| BLD-Footing | 2/2/2018 | 2/2/2018 | 2/2/2018 8:58:57 AM | A | PART |
|
|
DARYL - THEY ARE PLANNING ON POURING AT NOON SO THE EARLIER THE BETTER - PLEASE Phone #: ###-####. Perimeter footings, work in progress, almost complete. Ok to place conc. pending ok from special inspection agency.
|
MIS18-00028
| BLD-Conference | 1/26/2018 | 2/2/2018 | 2/2/2018 8:27:46 AM | A | PASS |
|
|
A building permit has been issued.
|
BLD16-04166
| BLD-Final | 2/1/2018 | 2/2/2018 | 2/2/2018 8:07:22 AM | A | NR |
|
|
Please call prior to heading to job to make sure we have access. Phone #: ###-#### Inspection requested via web by Brett Barrier. Needs electrical final and life afety finals first.
|
BLD17-03965
| BLD-Energy code compliance | 2/2/2018 | 2/2/2018 | 2/2/2018 12:00:00 AM | P | CANC |
|
|
should have been wall bracing not energy Shear // weis Phone #: ###-####
|