BLD01-00007
| BLD-Framing/Rough-in | 2/16/2001 | 2/20/2001 | 2/20/2001 12:00:00 AM | A | FAIL |
|
|
Scheduled by a contractor via Hello! on 02/16/2001 at 16:34:26. Contact: ###-####. not framed per plans; need details for brg. & 1hr wall; extent of 1hr wall?? do not cover2/20/2001 1:56:52 PM 2/20/2001 1:57:10 PM
|
BLD00-00514
| BLD-Framing/Rough-in | 2/19/2001 | 2/20/2001 | 2/20/2001 12:00:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 02/19/2001 at 09:43:23. Contact: ###-####....rec'd detail for 1hr hvac shaft; ok to proceed per GA WP 7008 and assoc detail 2/21/2001 3:51:31 PM
|
BLD00-03070
| BLD-Framing/Rough-in | 2/19/2001 | 2/20/2001 | 2/20/2001 12:00:00 AM | A | NR |
|
|
Scheduled by a contractor via Hello! on 02/19/2001 at 10:21:04. Contact: ###-####.
|
BLD00-02741
| BLD-Framing/Rough-in | 2/19/2001 | 2/20/2001 | 2/20/2001 12:00:00 AM | A | FAIL |
|
|
Scheduled by a contractor via Hello! on 02/19/2001 at 10:41:12. Contact: .complete nailing/ blocking at sw's at rear; finish insulation; recall 2/20/2001 11:58:29 AM
|
BLD00-01631
| BLD-Conference | 2/20/2001 | 2/20/2001 | 2/20/2001 12:00:00 AM | A | PART |
|
|
Added by Inspector: 340 On 2/20/2001 10:53:22 AM w/ Ron H... met w/ arch, rec'd eng's insp reports as req'd, need verify in field for modifications
|
BLD00-02347
| BLD-Conference | 2/20/2001 | 2/20/2001 | 2/20/2001 12:00:00 AM | A | PASS |
|
|
Added by Inspector: 340 On 2/20/2001 11:06:16 AM w/ owner re insulation at hvac
|
BLD01-00008
| BLD-Other | 2/20/2001 | 2/20/2001 | 2/20/2001 12:00:00 AM | P | PART |
|
|
Don Bryan, ###-#### - ceiling inspection ok pend hvac & elec ok 2/20/2001 4:33:27 PM
|
BLD00-03354
| BLD-Other | 2/20/2001 | 2/20/2001 | 2/20/2001 12:00:00 AM | P | PART |
|
|
Don Bryan, ###-####; grid, add spreaders, ok pend elec & hvac ok; firestop penetrations at corridor 2/20/2001 4:33:00 PM
|
BLD01-00097
| BLD-Conference | 2/20/2001 | 2/20/2001 | 2/20/2001 12:00:00 AM | P | PART |
|
|
Added by Inspector: 340 On 2/20/2001 4:35:26 PM demising wall need plbg/elec r/i ... met w/ contractor onsite
|
MEC01-00099
| Final | 2/20/2001 | 2/20/2001 | 2/20/2001 12:00:00 AM | P | PASS |
|
|
Added by Inspector: 340 On 2/20/2001 5:22:07 PM OK
|
BLD00-03070
| BLD-Conference | 2/20/2001 | 2/20/2001 | 2/20/2001 12:00:00 AM | P | PART |
|
|
Added by Inspector: 340 On 2/20/2001 5:29:08 PM W/ CONTRACTOR...RECALL; I'LL INFORM 301
|
BLD00-00514
| BLD-Conference | 2/20/2001 | 2/20/2001 | 2/20/2001 12:00:00 AM | P | PART |
|
|
Added by Inspector: 340 On 2/20/2001 5:31:16 PM NEED DETAIL FOR SHAFTWALL...G.A. OR??
|
BLD00-01954
| BLD-Conference | 2/20/2001 | 2/20/2001 | 2/20/2001 12:00:00 AM | P | PART |
|
|
Added by Inspector: 340 On 2/20/2001 5:58:12 PM w/ Lee of Id Youth Ranch....need complete insp process.
|
BLD00-03139
| BLD-Final | 2/20/2001 | 2/20/2001 | 2/20/2001 12:00:00 AM | P | FAIL |
|
|
jeff ###-####; C/N HANDRAILS; P&Z OK??? 2/20/2001 5:23:08 PM
|
BLD00-01150
| BLD-Final | 2/20/2001 | 2/20/2001 | 2/21/2000 12:00:00 AM | P | FAIL |
|
|
###-#### c/n, doors seals, seal corridors, handrail at north stair, etc. 2/21/2001 1:17:48 PM
|
BLD00-01151
| BLD-Final | 2/20/2001 | 2/20/2001 | 2/21/2000 12:00:00 AM | P | FAIL |
|
|
###-####, c/n re doors, handrails; obtain other finals 2/21/2001 1:15:09 PM
|
BLD00-02756
| BLD-Final | 2/20/2001 | 2/20/2001 | 2/21/2000 12:00:00 AM | P | FAIL |
|
|
###-####; c/n doors, closers,handrail at north stair, seal, patch corridor/passage lid 2/21/2001 1:16:11 PM
|
BLD00-02971
| BLD-Framing/Rough-in | 2/20/2001 | 2/20/2001 | 2/21/2000 12:00:00 AM | P | PART |
|
|
FRONT HALF OF STORE\\###-####; ok pend plbg for front of space; need infill block occ. sep wall 2/21/2001 11:51:36 AM
|