BLD99-03148
| BLD-Final | 2/16/2001 | 2/20/2001 | 2/20/2001 12:00:00 AM | A | FAIL |
|
|
reinspection 6th floor brett ###-#### met with Ken Howell, Jim Storey, Carl Dependahl and Brett to determine requirements for occupying the fifth floor. Exits to be maintained and sprinklers to be complete on fourth floor 2/20/2001 3:14:48 PM
|
FIR00-00627
| INSP-Sprinkler Rough-in/Hydro | 2/19/2001 | 2/20/2001 | 2/20/2001 12:00:00 AM | A | FAIL |
|
|
Scheduled by a contractor via Hello! on 02/19/2001 at 08:30:50. Contact: ###-####. c/n issued - earthquaking; FDC location; clearance at base of riser; dry and rack systems not approved 2/21/2001 10:33:44 AM
|
FIR00-00289
| INSP-Sprinkler Rough-in/Hydro | 2/20/2001 | 2/20/2001 | 2/20/2001 12:00:00 AM | P | PART |
|
|
Added by Inspector: 409 On 2/20/2001 3:31:55 PM underground hydro okay; repaired leak
|
BLD00-01261
| FIRE-Final Inspection | 2/19/2001 | 2/20/2001 | 2/20/2001 12:00:00 AM | P | FAIL |
|
|
Scheduled by a contractor via Hello! on 02/19/2001 at 07:44:48. Contact: ###-####. exits blocked by scaffolding; remote LED's for AHU detectors; address 2/20/2001 4:24:15 PM
|