Inspections for the day of: Tuesday, February 20, 2001.
Number of inspections: 16
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorDave Hannah
TitleBLD-COM/RES INSPECTOR
Phone #794-1967
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD00-03376 BLD-Framing/Rough-in2/16/20012/20/20012/20/2001 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 02/16/2001 at 12:57:23. Contact: ###-####.
BLD00-03189 BLD-Framing/Rough-in2/16/20012/20/20012/20/2001 12:00:00 AMAPASS
###-#### openning between the two spaces framed per engineering 2/20/2001 10:58:14 AM
BLD00-03701 BLD-Framing/Rough-in2/16/20012/20/20012/20/2001 12:00:00 AMAPART
###-#### panel on north side of garage needs more stapels ok to side the rest 2/20/2001 11:59:13 AM
BLD01-00077 BLD-Framing/Rough-in2/16/20012/20/20012/20/2001 12:00:00 AMAPASS
###-#### shear panels ok to cover 2/20/2001 11:59:43 AM
BLD00-00567 BLD-Final2/18/20012/20/20012/20/2001 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 02/18/2001 at 22:35:29. Contact: ###-####. 2/20/2001 9:49:20 AM
BLD00-03551 BLD-Footing2/19/20012/20/20012/20/2001 12:00:00 AMAPART
Scheduled by a contractor via Hello! on 02/19/2001 at 08:23:21. Contact: ###-####.
BLD00-02716 BLD-Framing/Rough-in2/15/20012/20/20012/20/2001 12:00:00 AMAFAIL
Scheduled by a contractor via Hello! on 02/15/2001 at 10:49:34. Contact: ###-####. shear panel inspection missing one hold down and needs to add stapels to panels 2/20/2001 9:51:19 AM
MEC01-00032 Final2/16/20012/20/20012/20/2001 12:00:00 AMPPASS
before 2:30 ###-####
BLD00-02822 BLD-Foundation2/19/20012/20/20012/20/2001 12:00:00 AMPPART
Scheduled by a contractor via Hello! on 02/19/2001 at 15:10:30. Contact: ###-####. stem walls for bldg. no. one 2/20/2001 4:13:33 PM
BLD00-03501 BLD-Energy code compliance2/20/20012/20/20012/20/2001 12:00:00 AMPPASS
Scheduled by a contractor via Hello! on 02/20/2001 at 08:15:46. Contact: ###-####.
BLD00-03008 BLD-Energy code compliance2/20/20012/20/20012/20/2001 12:00:00 AMPPASS
###-####
BLD00-03529 BLD-Framing/Rough-in2/20/20012/20/20012/20/2001 12:00:00 AMPFAIL
###-#### need more stapels on shear panels 2/20/2001 3:07:19 PM
BLD00-03530 BLD-Framing/Rough-in2/20/20012/20/20012/20/2001 12:00:00 AMPFAIL
###-#### shear panel need more staples 2/20/2001 3:06:35 PM
BLD00-03586 BLD-Final2/20/20012/20/20012/20/2001 12:00:00 AMPPASS
mike-- ###-#### fn occ
MEC01-00480 Rough-in2/20/20012/20/20012/20/2001 12:00:00 AMPPASS
Scheduled by a contractor via Hello! on 02/20/2001 at 10:50:37. Contact: ###-####.
MEC01-00480 Pressure Test2/20/20012/20/20012/20/2001 12:00:00 AMPPASS
Added by Inspector: 425 On 2/20/2001 1:33:55 PM