Inspections for the day of: Wednesday, February 20, 2002.
Number of inspections: 11
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorJim Sly
TitleBLD-COM/RES INSPECTOR
Phone #794-9465
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD01-03089 BLD-Other2/19/20022/20/20022/20/2002 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 02/19/2002 at 11:36:52. Contact: . Shear OK. 2/20/2002 10:52:05 AM
BLD01-03037 BLD-Final2/19/20022/20/20022/20/2002 12:00:00 AMAPASS
###-#### C/C issued 2/20/2002 10:37:35 AM
BLD01-03091 BLD-Final2/19/20022/20/20022/20/2002 12:00:00 AMAPASS
###-#### C/C issued. 2/20/2002 10:37:54 AM
BLD02-00110 BLD-Framing/Rough-in2/19/20022/20/20022/20/2002 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 02/19/2002 at 12:52:58. Contact: . Framing for (North side) TI OK....Advised to rock /tenent Dem wall to ceiling (S. side) at areas of different ceiling height to complete 1hr separation. 2/20/2002 9:24:54 AM
BLD01-02427 BLD-Framing/Rough-in2/19/20022/20/20022/20/2002 12:00:00 AMAFAIL
###-#### chad C/N posted 2/20/2002 2:01:53 PM
BLD01-01272 BLD-Wall cover2/19/20022/20/20022/20/2002 12:00:00 AMAFAIL
Scheduled by a contractor via Hello! on 02/19/2002 at 18:31:37. Contact: ###-####. C/N...Fireblock. 2/20/2002 10:17:25 AM
BLD01-02836 BLD-Final2/20/20022/20/20022/20/2002 12:00:00 AMPPASS
Scheduled by a contractor via Hello! on 02/20/2002 at 08:27:44. Contact: ###-####. C/C issued. 2/20/2002 1:43:48 PM
BLD01-02419 BLD-Framing/Rough-in2/20/20022/20/20022/20/2002 12:00:00 AMPPART
SHEER WALL ###-#### TODD East shear wall and exterior type X rock.....OK. 2/20/2002 3:29:50 PM
BLD01-01699 BLD-Final2/20/20022/20/20022/20/2002 12:00:00 AMPPASS
fn occ-- bill-- ###-#### C/C issued. 2/20/2002 2:45:23 PM
BLD01-03267 BLD-Framing/Rough-in2/20/20022/20/20022/20/2002 12:00:00 AMPPART
shear nailing-- cell ###-####--heidi Ext shear nailing OK. 2/20/2002 3:09:47 PM
BLD02-00237 BLD-Framing/Rough-in2/19/20022/20/20022/20/2002 12:00:00 AMPPASS
Scheduled by a contractor via Hello! on 02/19/2002 at 15:11:30. Contact: ###-####.