ELE01-04124
| Final | 2/14/2002 | 2/20/2002 | 2/20/2002 12:00:00 AM | A | PASS |
|
|
###-#### JACK. completed. 2/20/2002 9:23:32 AM
|
ELE02-00441
| Rough-In Permanent Service | 2/19/2002 | 2/20/2002 | 2/20/2002 12:00:00 AM | A | PASS |
|
|
BRANDON-- ###-####--R/I & SER.
install only 1-meter; (eastend unit)..
p/s ug n starlight ele #0441-ok 2/20/2002 10:23:46 AM
|
ELE02-00278
| Electrical Rough-In | 2/19/2002 | 2/20/2002 | 2/20/2002 12:00:00 AM | A | PASS |
|
|
###-#### paul andrews. pvc conduit in trench; conference, installation of service disconnects. ok. 2/20/2002 11:21:03 AM
|
ELE02-00336
| Electrical Rough-In | 2/20/2002 | 2/20/2002 | 2/20/2002 12:00:00 AM | P | PART |
|
|
partial ceiling cover- ###-#### louis. ceiling r/i north/west area, ok 2/20/2002 2:11:32 PM
|
ELE02-00408
| Rough-In Permanent Service | 2/20/2002 | 2/20/2002 | 2/20/2002 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 02/20/2002 at 08:57:31. Contact: ###-####. r/i; perm/svc. duplex
p/s ug n boise basin ele #0408-ok 2/20/2002 12:02:57 PM
|
ELE02-00447
| Rough-In Permanent Service | 2/20/2002 | 2/20/2002 | 2/20/2002 12:00:00 AM | P | PASS |
|
|
warren ###-####. r/i; perm/svc. permit by contractor obtained as per jschmer.
p/s oh n highmark #00447-ok 2/20/2002 2:49:14 PM
|