Inspections for the day of: Wednesday, February 20, 2002.
Number of inspections: 12
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorDave Hannah
TitleBLD-COM/RES INSPECTOR
Phone #794-1967
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD02-00227 BLD-Foundation2/19/20022/20/20022/20/2002 12:00:00 AMAPART
Scheduled by a contractor via Hello! on 02/19/2002 at 10:18:59. Contact: ###-####. work in progress 2/20/2002 3:20:37 PM
BLD01-03058 BLD-Framing/Rough-in2/19/20022/20/20022/20/2002 12:00:00 AMAFAIL
Scheduled by a contractor via Hello! on 02/19/2002 at 13:21:08. Contact: ###-####.c/n on site ok to insulate 2/20/2002 12:29:07 PM
BLD01-03058 BLD-Energy code compliance2/19/20022/20/20022/20/2002 12:00:00 AMAPART
Scheduled by a contractor via Hello! on 02/19/2002 at 13:21:57. Contact: ###-####. seal package ok to insulate 2/20/2002 12:29:31 PM
BLD01-02470 BLD-Framing/Rough-in2/19/20022/20/20022/20/2002 12:00:00 AMANR
Scheduled by Inspector: 408 On 2/19/2002 4:35:54 PM no plans or truss eng on site talked with framer he will get them and reschedule for tomorrow 2/20/2002 3:21:54 PM
MEC02-00275 Rough-in2/19/20022/20/20022/20/2002 12:00:00 AMAFAIL
Scheduled by Inspector: 408 On 2/19/2002 4:36:34 PM c/n items still not complet 2/20/2002 3:22:22 PM
BLD01-01560 BLD-Conference2/19/20022/20/20022/20/2002 12:00:00 AMADONE
Scheduled by a contractor via Hello! on 02/19/2002 at 16:47:53. Contact: . contractor added walls in attic space cutting off path of smoke to alarms needs to remove walls and bld as per plans so smoke det will work will mantain 1hr construction 2/20/2002 11:24:37 AM
BLD01-03072 BLD-Framing/Rough-in2/19/20022/20/20022/20/2002 12:00:00 AMAFAIL
###-#### JIM c/n on site 2/20/2002 10:36:29 AM
BLD01-03233 BLD-Framing/Rough-in2/19/20022/20/20022/20/2002 12:00:00 AMAFAIL
SHEER WALL ###-#### JOE straping ok but crew needs to go around and nail panels per engineering 2/20/2002 1:21:54 PM
BLD02-00025 BLD-Framing/Rough-in2/19/20022/20/20022/20/2002 12:00:00 AMPPASS
###-#### IVAN ok to insulate after elec r/i 2/20/2002 5:22:27 PM
BLD02-00047 BLD-Framing/Rough-in2/20/20022/20/20022/20/2002 12:00:00 AMPPART
nijaz-- ###-#### for homeowner--call 1st before insp shear nail ok to cover ext 2/20/2002 3:45:46 PM
MEC02-00229 Final2/20/20022/20/20022/20/2002 12:00:00 AMPCANC
Scheduled by a contractor via Hello! on 02/20/2002 at 08:38:26. Contact: ###-####.
BLD01-02888 BLD-Footing2/19/20022/20/20022/20/2002 12:00:00 AMPFAIL
###-#### LOGAN needs a letter from mti oking the footings 2/20/2002 3:58:53 PM