BLD01-02465
| FIRE-Final Inspection | 2/19/2002 | 2/20/2002 | 2/20/2002 12:00:00 AM | A | NR |
|
|
contractor cancelled with alarm system problems 2/20/2002 5:26:59 PM
|
FIR02-00042
| INSP-Sprinkler Rough-in | 2/19/2002 | 2/20/2002 | 2/20/2002 12:00:00 AM | A | PART |
|
|
Inspection for rough-in. OK for cover except along west wall. Upright and pendant sprinklers to be added along west wall. 2/20/2002 8:31:31 AM
|
BLD01-03219
| FIRE-Conference | 2/20/2002 | 2/20/2002 | 2/20/2002 12:00:00 AM | P | NR |
|
|
Had conference with contractor. Asked him to install one more fire extinguisher in corridor, add exit sign at north exit. Placement of other exit signs and emergency lights OK 2/20/2002 2:09:02 PM
|
MIS02-00027
| FIR-Final | 2/20/2002 | 2/20/2002 | 2/20/2002 12:00:00 AM | P | PASS |
|
|
Added by Inspector: 430 On 2/20/2002 2:37:12 PM Fire life/safety finaled
|
MIS01-00213
| FIR-Final | 2/20/2002 | 2/20/2002 | 2/20/2002 12:00:00 AM | P | PASS |
|
|
Added by Inspector: 430 On 2/20/2002 2:58:35 PM Fire life/safety finaled
|
FIR00-00419
| INSP-Sprinkler Rough-in/Hydro | 2/19/2002 | 2/20/2002 | 2/20/2002 12:00:00 AM | P | NR |
|
|
Inspection was to be for underground. Contractor cancelled because of trenching 2/20/2002 3:54:00 PM
|