Inspections for the day of: Thursday, February 20, 2003.
Number of inspections: 15
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorCarl Dependahl
TitleBLD-COM/RES INSPECTOR
Phone #794-9492
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD02-02857 BLD-Aging Inspection2/20/20032/20/20032/20/2003 12:00:00 AM PART
roof...w/ remodel, no call for roof 2/20/2003 11:23:55 AM
BLD02-01156 BLD-Foundation2/19/20032/20/20032/20/2003 12:00:00 AMAPART
Scheduled by a contractor via Hello! on 2/19/2003 at 3:22:51 PM. Contact: ###-####....pending letter from Dave Cram, soils eng'r re depth & suitability for concrete placement...also surveyor to verify setback/location as correct. 2/20/2003 11:27:02 AM
BLD02-02866 BLD-Final2/19/20032/20/20032/20/2003 12:00:00 AMAFAIL
###-#### ...c/n plbg final, firewall nailing & penetrations ( its a shearwall, too.) 2/20/2003 11:17:46 AM
MEC02-03848 Final2/19/20032/20/20032/20/2003 12:00:00 AMAPASS
###-####
MEC03-00068 Rough-in2/19/20032/20/20032/20/2003 12:00:00 AMAPART
Scheduled by a contractor via Hello! on 2/19/2003 at 4:10:20 PM. Contact: ###-####....c/n re combustion air
2/20/2003 11:19:42 AM
MEC03-00068 Pressure Test2/19/20032/20/20032/20/2003 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 2/19/2003 at 4:10:36 PM. Contact: ###-####.
BLD02-00199 BLD-Foundation2/19/20032/20/20032/20/2003 12:00:00 AMPPART
brian ###-####, wip, Strata onsite. 2/20/2003 5:41:00 PM
BLD02-02612 BLD-Final2/20/20032/20/20032/20/2003 12:00:00 AMPNR
Scheduled by a contractor via Hello! on 2/20/2003 at 7:34:33 AM. Contact: ###-####....keep c/n 2/20/2003 3:46:00 PM
BLD02-03056 BLD-Framing/Rough-in2/20/20032/20/20032/20/2003 12:00:00 AMPFAIL
dean; Phone #: ###-#### Internet Inspection Request from: Annette Moore, c/n...need eng's clarification re 2nd floor roof/wall bracing, etc. 2/20/2003 5:40:31 PM
BLD02-02866 BLD-Final2/20/20032/20/20032/20/2003 12:00:00 AMPPASS
###-#### dean
BLD02-03067 BLD-Energy code compliance2/20/20032/20/20032/20/2003 12:00:00 AMPPASS
dean; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie...c/n ok, has watt-sun 2/20/2003 5:38:36 PM
BLD03-00017 BLD-Final2/20/20032/20/20032/20/2003 12:00:00 AMPPASS
sign for Tablerock Printing; Phone #: ###-#### Internet Inspection Request from: Susie Seltzer
BLD02-01532 BLD-Framing/Rough-in2/20/20032/20/20032/20/2003 12:00:00 AMPCANC
clg grid adjacent to records...add seismic strut ok pend elec/hvac ok's...intall
BLD02-01532 BLD-Framing/Rough-in2/20/20032/20/20032/20/2003 12:00:00 AMPPART
grid; add strut...chk at final leave out that tile.
MEC02-03848 Final2/20/20032/20/20032/20/2003 12:00:00 AMPPASS