ELE04-00458
| Electrical Rough-In | 2/19/2004 | 2/20/2004 | 2/20/2004 12:00:00 AM | A | FAIL |
|
|
Scheduled by a contractor via Hello! on 2/19/2004 at 11:55:49 AM. Contact: ###-####. cor. posted called 300.4(D) 11/4" for MC and flex all 8 units 2/20/2004 9:15:31 AM
|
ELE04-00391
| Final | 2/19/2004 | 2/20/2004 | 2/20/2004 12:00:00 AM | A | PASS |
|
|
###-#### Saysaymone permanent occupancy ok 2/20/2004 10:01:39 AM
|
ELE03-00940
| Final | 2/19/2004 | 2/20/2004 | 2/20/2004 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 2/19/2004 at 1:36:16 PM. Contact: ###-####. ok 2/20/2004 8:31:51 AM
|
ELE04-00183
| Electrical Rough-In | 2/19/2004 | 2/20/2004 | 2/20/2004 12:00:00 AM | A | PASS |
|
|
Scott; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes ok 2/20/2004 11:06:11 AM
|
ELE03-03974
| Final | 2/19/2004 | 2/20/2004 | 2/20/2004 12:00:00 AM | P | PASS |
|
|
mike; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie 14 ok no card at house 2/20/2004 2:57:57 PM
|
ELE03-03905
| Electrical Rough-In | 2/19/2004 | 2/20/2004 | 2/20/2004 12:00:00 AM | P | NR |
|
|
Mike; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes walls east end 2nd floor 2/20/2004 12:38:08 PM
|
ELE04-00214
| Final | 2/20/2004 | 2/20/2004 | 2/20/2004 12:00:00 AM | P | FAIL |
|
|
Please call above number for access. Electrical concerns on project should be directed to ###-####.; Phone #: ###-#### Internet Inspection Request from: Dawn Moore cor. posted met with contractor 410.8 needs shelves installed in MB closets 110.3(B) provide instructions or gfci for fan above tub, shower in bathrm, provide access to recept for jtub so it can be tested and serviced 2/20/2004 2:04:41 PM
|
ELE04-00367
| Electrical Rough-In | 2/20/2004 | 2/20/2004 | 2/20/2004 12:00:00 AM | P | NR |
|
|
duncan- ###-#### r/i for kit NR conference ok 2/20/2004 3:59:42 PM
|
ELE04-00401
| Electrical Rough-In | 2/20/2004 | 2/20/2004 | 2/20/2004 12:00:00 AM | P | PART |
|
|
Phone #: ###-#### Internet Inspection Request from: Andy Rose r/i ok correction for p/s 2/20/2004 1:25:43 PM
|
ELE04-00327
| Rough-In Permanent Service | 2/19/2004 | 2/20/2004 | 2/20/2004 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 2/19/2004 at 2:15:34 PM. Contact: ###-####. Scott will call for final
p/s u/g new for meter in electrical rm ok 2/20/2004 3:27:03 PM
|