Inspections for the day of: Wednesday, February 20, 2008.
Number of inspections: 17
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorForrest France
TitleFIRE INSPECTOR
Phone #794-1981
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD06-02677 FIRE-Final Inspection2/19/20082/20/20082/21/2008 2:30:15 PMAFAIL
No approved set of plans on site.Plan review notes require mixing room to be sprinklered, no sprinkler work has been completed per plan review notes. Could not complete inspection do to paint booth being used.KR
BLD07-00430 FIRE-Final Inspection2/20/20082/20/20082/20/2008 5:17:43 PMPNH
No access to complete inspection, rescheduled per conversation with contractor.
FIR07-01051 INSP-Sprinkler Rough-in2/20/20082/20/20082/20/2008 5:11:12 PMPPART
UG fire supply line and remote FDC piping are approved for bury, need to install caps at the risers and seismic clearance method at the floor slab penetrations.
BLD07-00898 FIRE-Final Inspection2/19/20082/20/20082/20/2008 4:36:46 PMAPASS
Fire life safety per scope of permit work finaled.
BLD06-03527 FIRE-Final Inspection2/20/20082/20/20082/20/2008 4:13:31 PMPPART
Final pending shell and core permit finals, also need to attatch closure at the west door to the exit corridor.
FIR07-00471 INSP-Final Inspection2/20/20082/20/20082/20/2008 4:12:14 PMAPASS
Fire alarm permit work passed field testing.
FIR06-00540 INSP-Sprinkler Rough-in2/19/20082/20/20082/20/2008 3:37:42 PMAPART
OH installation for the plaza level branch lines and sprinklers as annotated on stamped plans is approved for cover, preliminary hydrostatic has been completed- will retest when the balance of the new main is finished.
FIR08-00037 INSP-Sprinkler Rough-in2/18/20082/20/20082/20/2008 3:07:58 PMPPART
See areas on approved plans okayed for cover, noted missing unistrut clamps at two locations on the 1 1/2 main, tie-in and EQ brace at the 2" main and 1 1/2 mains are not yet completed, need one upright installed at open office area south side, some noted items from previous inspection are finished, need to complete a hydrostatic test at the east office area new main and branch lines.
FIR07-00854 INSP-Supply line flush2/19/20082/20/20082/20/2008 2:18:32 PMPCANC
Inspection rescheduled per contractor due to coordination with United Water company.
FIR08-00086 INSP-Final Inspection2/19/20082/20/20082/20/2008 2:16:26 PMAPASS
Fire sprinkler work completed acceptable, inspection passed, permit finaled.
BLD08-00084 FIRE-Final Inspection2/19/20082/20/20082/20/2008 1:31:05 PMAPASS
Fire life safety passed.
BLD07-02772 FIRE-Final Inspection2/20/20082/20/20082/20/2008 12:58:26 PMPPASS
Fire life safety finaled.
BLD07-03122 FIRE-Final Inspection2/20/20082/20/20082/20/2008 12:57:39 PMPPASS
Fire life safety inspection passed.
BLD07-02576 FIRE-Final Inspection2/20/20082/20/20082/20/2008 11:17:01 AMAPASS
Fire life safety is acceptable pending installation of door hardware and signage at the east terrace door per review comments-to be complete prior to structural final as discussed. PFE has been certified, remainder of life safety items okayed.
BLD08-00060 FIRE-Final Inspection2/20/20082/20/20082/20/2008 11:09:04 AMAFAIL
Lacking proper fire alarm notification coverage due to remodel work.
FIR07-01008 INSP-Final Inspection2/20/20082/20/20082/20/2008 11:05:09 AMPPASS
Fire alarm testing passed, noted two duct detectors have been deleted due to HVAC capacities below 2000 cfm.
FIR07-00946 FIR-Aging Inspection2/20/20082/20/20082/20/2008 9:08:52 AM DEFR
Pending field inspection request.