FIR08-00107
| INSP-Sprinkler Rough-in | 2/20/2008 | 2/20/2008 | 2/20/2008 5:45:11 PM | P | PASS |
|
|
Underground flush passed.
|
FIR08-00077
| INSP-Sprinkler Rough-in | 2/19/2008 | 2/20/2008 | 2/20/2008 5:44:23 PM | P | PASS |
|
|
Underground supply piping is ok to cover
|
FIR07-00199
| INSP-Final Inspection | 2/15/2008 | 2/20/2008 | 2/20/2008 5:42:31 PM | A | FAIL |
|
|
System was completely tested. found that they were not ready to test duct detectors,Also found that sprinkler bell rings on general building alarm, not water flow. Mangates on outside of building did not release during fire alarm, gates are access to public way. KR
|
BLD06-02599
| FIRE-Final Inspection | 2/18/2008 | 2/20/2008 | 2/20/2008 3:39:06 PM | P | PASS |
|
|
Life safety passed.
|
FIR07-01013
| INSP-Sprinkler Rough-in/Hydro | 2/19/2008 | 2/20/2008 | 2/20/2008 3:27:12 PM | P | PASS |
|
|
The wet system and dry system hydro tests passed.
|
FIR08-00015
| INSP-Sprinkler Rough-in/Hydro | 2/19/2008 | 2/20/2008 | 2/20/2008 3:26:13 PM | P | PASS |
|
|
All piping except the second floor is ok to cover. Brian Johnson needs to approve the new piping arrangement. The dry system hydro test passed. The wet system hydro test failed.
|
FIR08-00107
| INSP-Sprinkler Rough-in | 2/20/2008 | 2/20/2008 | 2/20/2008 2:21:29 PM | A | PASS |
|
|
The underground supply piping is ok to cover.
|
FIR07-00578
| INSP-Sprinkler Rough-in | 2/19/2008 | 2/20/2008 | 2/20/2008 2:15:56 PM | A | CANC |
|
|
To be rescheduled for tomorrow morning
|
BLD07-01770
| FIRE-Final Inspection | 2/20/2008 | 2/20/2008 | 2/20/2008 2:02:43 PM | A | PASS |
|
|
LIfe safety passed.
|
FIR08-00022
| INSP-Sprinkler Rough-in/Hydro | 2/20/2008 | 2/20/2008 | 2/20/2008 8:48:41 AM | A | PASS |
|
|
Permit finaled
|