ESC07-01212
| Site Preparation | 2/20/2008 | 2/20/2008 | 2/20/2008 1:29:16 PM | P | PART |
|
|
Explained to Brett about sediment on sidewalks and street needs to be swept. Also reccommend a plastic liner in the concrete washout and a curb or something to block runoff from entering the gutter.
|
ESC07-00852
| Site Final | 2/20/2008 | 2/20/2008 | 2/20/2008 11:14:32 AM | A | PASS |
|
|
Pass. Due to 30 day start of construction the soil does not need to be stabilized.
CAS #460 ###-####
|
ESC07-00473
| BMP Violation | 2/15/2008 | 2/20/2008 | 2/20/2008 10:23:59 AM | A | PASS |
|
|
Site is free of spoil debris. PASS Notified RP of passing.
CAS #460 ###-####
|
ESC07-00824
| BMP Violation | 2/15/2008 | 2/20/2008 | 2/20/2008 9:54:16 AM | A | PASS |
|
|
Signs posted at front of lot. Debris is mostly picked up except the work in progress. Was told it would be picked up through out the day. Wattle was installed at front of lot as a sediment barrier. Tracking has been cleaned up off of street. PASS CAS #460 ###-####
|