Inspections for the day of: Friday, February 20, 2009.
Number of inspections: 18
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorForrest France
TitleFIRE INSPECTOR
Phone #794-1981
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR09-00104 INSP-Sprinkler Rough-in2/20/20092/20/20092/20/2009 4:38:16 PMPDEFR
Don Phone #: ###-####
FIR07-01051 INSP-Sprinkler Rough-in2/20/20092/20/20092/20/2009 4:38:03 PMPDEFR
mike Phone #: ###-####
BLD08-02225 FIRE-Conference2/19/20092/20/20092/20/2009 4:17:17 PMADEFR
To be rescheduled per phone call.
BLD08-01070 FIRE-Final Inspection2/19/20092/20/20092/20/2009 4:16:20 PMAFAIL
Two smoke alarms- one 1st floor and one at a 2nd floor bedroom are located too close (within 3') of adjacent HVAC diffusers.
FIR08-00103 INSP-Final Inspection2/20/20092/20/20092/20/2009 3:54:29 PMPPART
Remainder of fire alarm testing completed satisfactory, noted corrections have been finished, elevator, FACP, balance of notification, etc. all tested okay. Final pending one SD for door release at the trash room level P1 to be tested (missing power to overhead door), and provision of resubmittal plans for field modifications including added ID detectors, hoistway devices, deleted points, accurate matrix, etc. as discussed.
FIR08-00104 INSP-Alarm Testing2/19/20092/20/20092/20/2009 3:54:03 PMAPART
Remainder of fire alarm testing completed satisfactory, noted corrections have been finished, elevator, FACP, balance of notification, etc. all tested okay. Final pending one SD for door release at the trash room level P1 to be tested (missing power to overhead door), and provision of resubmittal plans for field modifications including added ID detectors, hoistway devices, deleted points, accurate matrix, etc. as discussed.
BLD06-01451 FIRE-Final Inspection2/19/20092/20/20092/20/2009 3:48:27 PMADEFR
Discussed project related fire alarm and sprinkler permit work for finals and scheduling for life safety inspection.

FIR08-00724 INSP-Final Inspection2/19/20092/20/20092/20/2009 3:35:32 PMAPART
Fire alarm work completed to date tested satisfactory, additional tool equipment and associated alarm interconnections not yet installed-permit final pending.
FIR08-00806 INSP-Final Inspection2/19/20092/20/20092/20/2009 3:32:48 PMAPASS
Fire alarm testing passed, permit finaled.
BLD08-01680 FIRE-Final Inspection2/19/20092/20/20092/20/2009 3:30:10 PMAPASS
Scope of demo permit work completed, inspection passed.
BLD08-00660 FIRE-Final Inspection2/19/20092/20/20092/20/2009 3:29:26 PMAPASS
Fire life safety inspection completed acceptable.--Per phone call from Forrest France Fire alarm completed under shell with the Simplex Grinell permit. The Fire Sprinkler was completed under FIR07-00772.
BLD08-00659 FIRE-Final Inspection2/19/20092/20/20092/20/2009 3:28:27 PMAPASS
Noted correction items verified for compliance, fire life safety passed.
BLD08-00658 FIRE-Final Inspection2/19/20092/20/20092/20/2009 3:27:32 PMAPASS
Inspection passed per activity notes 7/16/08, fire life safety finaled.
BLD08-02478 FIRE-Final Inspection2/20/20092/20/20092/20/2009 3:25:52 PMPPASS
Corrections completed per final structural inspection done by D. Hannah, life safety finaled.
FIR09-00009 INSP-Final Inspection2/19/20092/20/20092/20/2009 3:24:16 PMAPASS
Fire alarm permit finaled.
FIR09-00009 INSP-Alarm Testing2/19/20092/20/20092/20/2009 3:23:46 PMAPASS
Fire alarm work passed field testing.
BLD08-02478 FIRE-Final Inspection2/19/20092/20/20092/20/2009 3:20:44 PMAFAIL
Need to provide approved door hardware at two locations including the restroom and new conference room, repair one EM light, post one fire extinguisher as indicated per plan.
BLD08-00378 FIRE-Final Inspection2/19/20092/20/20092/20/2009 12:00:00 AMACANC
Rick- life safety Phone #: ###-####