Inspections for the day of: Friday, February 20, 2009.
Number of inspections: 44
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorMike Jordan
TitleBLD-COM/RES INSPECTOR
Phone #794-9473
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD08-02465 BLD-Aging Inspection2/20/20092/20/20092/25/2009 2:52:46 PM DONE
BLD08-02202 BLD-Framing/Rough-in2/20/20092/20/20092/20/2009 4:00:27 PMPPART
2nd.floor, 1st.layer, one side only, type x rock. for 2he. wall.
BLD08-02187 BLD-Framing/Rough-in2/20/20092/20/20092/20/2009 3:55:29 PMPNR
BLD08-02188 BLD-Framing/Rough-in2/20/20092/20/20092/20/2009 3:55:12 PMPNR
BLD08-02189 BLD-Framing/Rough-in2/20/20092/20/20092/20/2009 3:54:49 PMPPART
1st. floor, 1st. layer, one side only, type x rock for 2hr. wall.
ESC08-00880 Tracking Control2/20/20092/20/20092/20/2009 3:53:11 PMPPART
Contractor is sweeping on daily and as needed basis. Trackout is minimal.
ESC08-00881 Tracking Control2/20/20092/20/20092/20/2009 3:52:27 PMPPART
Contractor is sweeping on daily and on as needed basis. Trackout is minimal.
ESC08-00882 Tracking Control2/20/20092/20/20092/20/2009 3:51:46 PMPPART
Contractor is sweeping daily and on as needed basis. Trackout is minimal.
ESC08-00883 Tracking Control2/20/20092/20/20092/20/2009 3:51:04 PMPPART
Contractor is sweeping on daily and as needed basis. Trackout is minimal.
BLD08-02190 BLD-Footing2/20/20092/20/20092/20/2009 3:50:27 PMPPASS
Interior footings ok.
BLD08-02192 BLD-Footing2/20/20092/20/20092/20/2009 3:50:06 PMPPASS
Interior footings ok.
BLD08-02191 BLD-Footing2/20/20092/20/20092/20/2009 3:49:43 PMPPASS
Interior footings ok.
BLD08-02193 BLD-Footing2/20/20092/20/20092/20/2009 3:49:21 PMPPASS
Interior footings ok.
ESC08-00889 BMP Violation2/20/20092/20/20092/20/2009 3:09:09 PMPPART
Significant progress has been made in cleanup. Needs to pick up all trash and const. debries.
ESC08-00890 BMP Violation2/20/20092/20/20092/20/2009 3:08:13 PMPPART
Significant progress has been made on cleanup. Needs to pickup all const. debries.
ESC08-00892 BMP Violation2/20/20092/20/20092/20/2009 3:07:17 PMPPART
Significant progress has been made on clean up. Needs to pickup all const. debries.
ESC08-00894 BMP Violation2/20/20092/20/20092/20/2009 3:06:36 PMPPART
Significant progress has been made on cleanup. Needs to cleanup all const. debries.
BLD08-02198 BLD-Framing/Rough-in2/19/20092/20/20092/20/2009 3:05:36 PMPNR
Scheduled by a contractor via Hello! on 2/19/2009 at 9:59:09 PM. Contact: ###-####.
BLD08-02197 BLD-Framing/Rough-in2/19/20092/20/20092/20/2009 3:05:17 PMPNR
Scheduled by a contractor via Hello! on 2/19/2009 at 9:58:10 PM. Contact: ###-####.
BLD08-02199 BLD-Framing/Rough-in2/19/20092/20/20092/20/2009 3:05:01 PMPNR
Scheduled by a contractor via Hello! on 2/19/2009 at 9:59:51 PM. Contact: ###-####.
BLD08-02200 BLD-Framing/Rough-in2/19/20092/20/20092/20/2009 3:04:43 PMPNR
Scheduled by a contractor via Hello! on 2/19/2009 at 10:00:51 PM. Contact: ###-####.
ESC08-00899 BMP Violation2/20/20092/20/20092/20/2009 3:00:57 PMPPART
Significant progress has been on cleanup. WIP on picking up const. debries.
ESC08-00900 BMP Violation2/20/20092/20/20092/20/2009 3:00:08 PMPPART
Significant progress has been made in cleanup. Wip on cleaning up const. debries.
ESC08-00901 BMP Violation2/20/20092/20/20092/20/2009 2:59:04 PMPPART
Significant progress has been made on cleanup. Needs to pick up const. debries.
BLD08-02206 BLD-Framing/Rough-in2/19/20092/20/20092/20/2009 2:57:06 PMPCANC
Scheduled by a contractor via Hello! on 2/19/2009 at 10:02:21 PM. Contact: ###-####.
BLD08-02207 BLD-Framing/Rough-in2/19/20092/20/20092/20/2009 2:55:58 PMPCANC
Scheduled by a contractor via Hello! on 2/19/2009 at 10:03:02 PM. Contact: ###-####.
BLD08-02205 BLD-Framing/Rough-in2/19/20092/20/20092/20/2009 2:55:08 PMPCANC
Scheduled by a contractor via Hello! on 2/19/2009 at 10:01:38 PM. Contact: ###-####.
BLD08-01926 BLD-Framing/Rough-in2/20/20092/20/20092/20/2009 2:47:25 PMPPASS
ESC08-00878 Tracking Control2/20/20092/20/20092/20/2009 12:53:04 PMPPART
Contractor is sweeping as needed and on daily basis. Trackout is minimal.
ESC08-00875 Tracking Control2/20/20092/20/20092/20/2009 12:48:33 PMAPART
Contractor is sweeping on daily and as needed basis. Trackoout is minimal.
ESC08-00877 Tracking Control2/20/20092/20/20092/20/2009 12:47:46 PMAPART
Contractor is sweeping on daily and as needed basis. Trackout is minimal.
ESC08-00879 Tracking Control2/20/20092/20/20092/20/2009 12:47:02 PMAPART
Sweepinfg is being done on daily and as needed basis. Trackout is minimal.
BLD08-02186 BLD-Framing/Rough-in2/19/20092/20/20092/20/2009 12:45:31 PMACANC
Scheduled by a contractor via Hello! on 2/19/2009 at 9:49:18 PM. Contact: ###-####.
BLD08-02187 BLD-Framing/Rough-in2/19/20092/20/20092/20/2009 12:45:02 PMACANC
Scheduled by a contractor via Hello! on 2/19/2009 at 9:50:26 PM. Contact: ###-####.
BLD08-02188 BLD-Framing/Rough-in2/19/20092/20/20092/20/2009 12:44:45 PMACANC
Scheduled by a contractor via Hello! on 2/19/2009 at 9:51:33 PM. Contact: ###-####.
BLD08-02189 BLD-Framing/Rough-in2/19/20092/20/20092/20/2009 12:44:29 PMACANC
Scheduled by a contractor via Hello! on 2/19/2009 at 9:52:40 PM. Contact: ###-####.
ESC08-00895 BMP Violation2/20/20092/20/20092/20/2009 12:19:46 PMAPART
Progress has been made on cleanup. Needs to sweep conc. from gutter pan and cleanup const. debries.
BLD08-02201 BLD-Framing/Rough-in2/19/20092/20/20092/20/2009 12:18:53 PMACANC
Scheduled by a contractor via Hello! on 2/19/2009 at 9:54:07 PM. Contact: ###-####.
ESC08-00896 BMP Violation2/20/20092/20/20092/20/2009 12:18:29 PMAPART
Progress has been made on cleanup. Needs to sweep conc. from gutterpan and clean up const. debries.
BLD08-02202 BLD-Framing/Rough-in2/19/20092/20/20092/20/2009 12:17:34 PMANR
Scheduled by a contractor via Hello! on 2/19/2009 at 9:55:03 PM. Contact: ###-####.
ESC08-00897 BMP Violation2/20/20092/20/20092/20/2009 12:17:09 PMAPART
Progress has been made on cleanup. Needs to sweep conc. from gutterpan and clean up const. debries.
BLD08-02203 BLD-Framing/Rough-in2/19/20092/20/20092/20/2009 12:16:17 PMAPART
Scheduled by a contractor via Hello! on 2/19/2009 at 9:56:01 PM. Contact: ###-####. 2nd. floor, 1st. layer type x rock for 2hr. wall, both sides.
ESC08-00898 BMP Violation2/20/20092/20/20092/20/2009 12:14:57 PMAPART
Contracotr has made significant progress on clean p. did note some conc. in gutterpan that needs to be swept and also needs to cleanup const. debries.
BLD08-02204 BLD-Framing/Rough-in2/19/20092/20/20092/20/2009 12:13:06 PMAPART
Scheduled by a contractor via Hello! on 2/19/2009 at 9:56:49 PM. Contact: ###-####. 2nd. floor, 1st. layer type x rock for 2hr. wall, both sides.