ESC12-01174
| BMP Violation | 2/19/2013 | 2/20/2013 | 2/22/2013 12:00:00 AM | A | FAIL |
|
|
Written CN issued and met with RP on site to review. 1. Pick up trash. 2. Clean dirt off of hard surfaces. 3. Complete ESC permit signage with ESC permit number
|
MIS13-00034
| ESC-Conference | 2/19/2013 | 2/20/2013 | 2/20/2013 10:09:57 AM | A | DONE |
|
|
Conference with RP and excavator contractor (Apex) to discuss permitting requirements. Gene will be at City Hall today to permit lot.
|
ESC12-01192
| BMP Violation | 2/19/2013 | 2/20/2013 | 2/20/2013 10:09:01 AM | A | PART |
|
|
Conference with RP and excavator contractor (Apex). No washout containment on site. In process of pour at time of inspection. DI BMP replaced with approved BMP; silt fence in but not yet trenched; Trucks using adjacent paved driveway for access.
|
ESC13-00046
| BMP Violation | 2/19/2013 | 2/20/2013 | 2/20/2013 12:00:00 AM | A | FAIL |
|
|
Written CN issued. Spoke with RP via telephone: 1. Clean dirt from hard surfaces and gutter. 2. Clean illicit washout off ground and provide an effective washout prior to next pour. Will re-inspect 2/22/22013
|
ESC13-00065
| BMP Violation | 2/19/2013 | 2/20/2013 | 2/20/2013 12:00:00 AM | A | FAIL |
|
|
Written CN issued 1. clean all dirt off of hard surfaces. 2. move stockpile off of sidewalk. 3. clean up illicit concrete washout on ground. 4. provide effective washout prior to next pour (next pour is scheduled today). Will reinspect 2/22
|
ESC12-01116
| BMP Violation | 2/19/2013 | 2/20/2013 | 2/20/2013 12:00:00 AM | A | FAIL |
|
|
Written CN issued and met RP on site to review. 1. Clean dirt off of hard surfaces. 2. Pick up trash. 3. Clean illicit washouts from concrete, stucco, mortar washouts off of ground and provide containment for future washouts.
|
ESC13-00010
| BMP Violation | 2/19/2013 | 2/20/2013 | 2/20/2013 12:00:00 AM | A | FAIL |
|
|
Written CN issued and spoke with builder. 1. Clean dirt from hard surfaces. 2. Clean up illicit concrete washout. 3. Extend permit coverage to include the additional disturbance on neighboring lot and stabilize (builder reported he plans to obtain building permit within 2-3 weeks for this lot). Ref MIS13-00037 to monitor until BLD is issued. 4. Update permit with valid Responsible Person (note RP is no longer Rob Haddock). Will re-inspect 2/22
|
ESC12-01215
| BMP Violation | 2/20/2013 | 2/20/2013 | 2/20/2013 12:00:00 AM | A | FAIL |
|
|
Written CN issued and met RP on site to review. 1. Post ESC sign with ESC permit number. 2. clean dirt and debris off hard surfaces. 3. pick up all trash. Will re-inspect 2/22
|
ESC12-01088
| BMP Violation | 2/20/2013 | 2/20/2013 | 2/20/2013 12:00:00 AM | A | FAIL |
|
|
Written Correction Notice Issued and met RP on site to review. 1. Post ESC sign. 2. Pick up trash. 3. Clean dirt from hard surfaces and gutter. Will re-inspect 2/22/2013
|
ESC12-00998
| BMP Violation | 2/20/2013 | 2/20/2013 | 2/20/2013 12:00:00 AM | A | FAIL |
|
|
Written CN issued and met with RP on site to review. 1. Pick up trash. 2. Clean dirt from hard surfaces. 3. Clean up all stucco and washouts on ground and provide containment. Will re-inspect 2/22
|