BLD14-02773
| BLD-Final | 2/19/2015 | 2/20/2015 | 2/20/2015 4:32:50 PM | A | PASS |
|
|
Jeffrey Phone #: ###-####
|
BLD13-00187
| BLD-Wall Bracing | 2/19/2015 | 2/20/2015 | 2/20/2015 4:30:42 PM | A | PART |
|
|
Gary-F wing 1,2,3,4,floor Phone #: ###-#### sheer naill ok pending rfi as to top plate or blk. top of sheathing.
|
BLD14-00681
| BLD-Energy code compliance | 2/19/2015 | 2/20/2015 | 2/20/2015 3:53:26 PM | P | PASS |
|
|
Section 1 Level 2 // Jose Phone #: ###-####
|
BLD14-03570
| BLD-Final | 2/20/2015 | 2/20/2015 | 2/20/2015 3:13:27 PM | P | PASS |
|
|
Doug Phone #: ###-####
|
BLD14-03715
| BLD-Framing/Rough-in | 2/19/2015 | 2/20/2015 | 2/20/2015 2:24:34 PM | P | PASS |
|
|
Phone #: 9571595 >> Inspection requested via mobile web by Kevin slazas
|
BLD14-03408
| BLD-Energy code compliance | 2/19/2015 | 2/20/2015 | 2/20/2015 2:03:28 PM | P | PASS |
|
|
Cameron Phone #: ###-####
|
BLD14-03560
| BLD-Framing/Rough-in | 2/19/2015 | 2/20/2015 | 2/20/2015 1:40:41 PM | A | PASS |
|
|
Mark Phone #: ###-####
|
BLD14-01937
| BLD-Framing/Rough-in | 2/19/2015 | 2/20/2015 | 2/20/2015 1:40:39 PM | A | PART |
|
|
Inspect rough frame lvl 2. Inspect drywall on lvl 4. Look at lvl 1 soffit Phone #: ###-#### Inspection requested via web by Julian Lopezinsulation 2nd floor coridor ok gyp 3 layer ok/ interior poduim soffit ok// exterior soffit 3 hr not extending thru soffit. rfi.
|
BLD13-03405
| BLD-Wall cover | 2/19/2015 | 2/20/2015 | 2/20/2015 11:04:46 AM | A | PASS |
|
|
Drywall at corridor lids in towers 3 ; 4 Phone #: ###-#### Inspection requested via web by Tim Toups
|
BLD13-03405
| BLD-Energy code compliance | 2/19/2015 | 2/20/2015 | 2/20/2015 11:04:05 AM | A | PASS |
|
|
3rd floor tower 2 insulation at ceiling only Phone #: ###-#### Inspection requested via web by Tim Toups
|