Inspections for the day of: Friday, February 20, 2015.
Number of inspections: 13
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorCevyn Recla
TitleELE-INSPECTOR
Phone #985-3493
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ELE14-03235 Final2/20/20152/20/20152/20/2015 2:00:28 PMPFAIL
Ron Phone #: ###-####
250.32 Building supplied by feeder or branch circuit shall have a grounding electrode system
225.32 Seperate building, disconnecting means shall be installed at nearest point of entrance of conductors
250.104 (C) Structural Metal. Exposed structural metal that is interconnected
to form a metal building frame and is not
intentionally grounded or bonded and is likely to become
energized shall be bonded to the service equipment enclosure;
ELE15-00431 Final2/20/20152/20/20152/20/2015 12:47:33 PMPPART
Partial - Rocky Phone #: ###-####
removed a piece of romex that was feeding an outet outside of bathroom, replaced GFI and outlet with new TR receptacles. Partial Final, first floor rooms 129, 131, 133, 134, 135, 136, 137, 138, 140, 142, second floor rooms 229, 234
ELE14-02485 Final2/18/20152/20/20152/20/2015 12:08:10 PMPPASS
FInal OK
ELE15-00442 Final2/20/20152/20/20152/20/2015 12:07:20 PMPCANC
needed PS inspection
ELE15-00442 Permanent Service2/20/20152/20/20152/20/2015 12:06:31 PMPPASS
P/S, O/H, R/C, OK
ELE14-03201 Final2/19/20152/20/20152/20/2015 10:54:05 AMAFAIL
james is the contact at ###-#### Phone #: ###-#### Inspection requested via web by Tracy Robertson
called James
408.4 every circuit shall be labeled clear, evident, specific purpose- unit 104
210.12 A arc fault protection required for outlets in dwelling bedrooms
314.21 non combustible materials shall be repaired so no gap greater than 1/8 inch at edge of boxes- drywall gaps around panels
BCC 4.05.26 Trim out inspections require all items to be functional, outlets not working in kitchen unit 103
ELE11-00879 ELE-Aging Inspection2/20/20152/20/20152/20/2015 9:38:10 AM DONE
Waiting to schedule for final
ELE15-00401 Final2/13/20152/20/20152/20/2015 9:37:24 AMAPASS
Their office opens at 830 am. Phone #: ###-#### Inspection requested via web by Dan Mitchell
Final OK
ELE15-00401 Electrical Rough-In2/13/20152/20/20152/20/2015 9:37:01 AMAPASS
Their office opens at 830 am. Phone #: ###-#### Inspection requested via web by Dan Mitchell
RI OK
ELE14-02485 Final2/18/20152/20/20152/20/2015 9:24:40 AMACANC
Call Bill first ###-#### Phone #: ###-#### Inspection requested via web by Bill Litzebauer
needed PM, not AM i
ELE13-02226 Final2/19/20152/20/20152/20/2015 9:22:02 AMACANC
Dean// please call before Phone #: ###-####
This was a conference inspection, not final, discussed securing of romex at box entrances before cover
ELE15-00053 Electrical Rough-In2/20/20152/20/20152/20/2015 8:55:33 AMAPASS
Floor heat inspection in the laundry room. Thank You Phone #: ###-#### Inspection requested via web by Eric Brown
Floor heat, laundry room ok to cover
ELE15-00159 Electrical Rough-In2/19/20152/20/20152/20/2015 8:39:43 AMAPASS
Bonding for mesh in concrete. Phone #: ###-#### Inspection requested via web by Kotton Corder OK to cover