Inspections for the day of: Tuesday, February 20, 2018.
Number of inspections: 13
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTroy Cobbley
TitleFIRE INSPECTOR
Phone #794-9483
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD17-03774 FIRE-Final Inspection2/20/20182/20/20182/22/2018 10:30:58 AMPPASS
Life safety passed

Chad Phone #: ###-####
BLD17-00644 FIRE-Final Inspection2/19/20182/20/20182/20/2018 2:34:55 PMPPASS
Life safety passed
FIR16-00628 INSP-Final Inspection2/19/20182/20/20182/20/2018 2:34:33 PMAPART
Today we verified function of various room detectors, two of the three roof top units and the delayed egress doors. I noted that one hvac unit did not function and I need verification that the spot type detector being utilized is listed for the max air flow expected in the hvac unit, the southwest delayed egress door did not function.
BLD18-00159 FIRE-Conference2/20/20182/20/20182/20/2018 2:00:52 PMPDONE
Abel Phone #: ###-####
BLD17-04514 FIRE-Final Inspection2/19/20182/20/20182/20/2018 12:27:46 PMPPASS
Life safety passed.

Phone #: ###-#### Inspection requested via web by Scott Simons
BLD17-03725 FIRE-Final Inspection2/20/20182/20/20182/20/2018 11:41:32 AMPPASS
Life safety passed

Zack Phone #: ###-####-please do as early PM as possible as the building final is late pm today
FIR18-00055 INSP-Final Inspection2/20/20182/20/20182/20/2018 10:30:58 AMPPASS
permit finaled

John Phone #: ###-####
BLD18-00214 FIRE-Final Inspection2/16/20182/20/20182/20/2018 10:27:13 AMAPASS
Life safety passed

Matt Phone #: ###-####
FIR17-00454 INSP-Sprinkler Rough-in2/19/20182/20/20182/20/2018 10:10:26 AMAPASS
Tenting and pipe rough-in passed. Piping can be covered.
BLD16-01757 FIRE-Alarm Testing2/19/20182/20/20182/20/2018 8:23:15 AMACANC
continued phased inspection of alarms Phone #: ###-#### Inspection requested via web by Steve Jacobsen
BLD17-03725 FIRE-Final Inspection2/14/20182/20/20182/20/2018 8:15:11 AMAFAIL
Two exit signs failed to function

Zach Phone #: ###-####
FIR17-00522 INSP-Sprinkler Rough-in2/16/20182/20/20182/20/2018 7:56:24 AMAFAIL
There were no city approved plans on site to verify the earthquake bracing. I noted that the earthquake attachments for the cpvc piping are not shown on the plans.


hallways on 4th,3rd and 2nd Phone #: ###-#### Inspection requested via web by Matthew Lewis
BLD17-04025 FIRE-Final Inspection2/20/20182/20/20182/20/2018 12:00:00 AMPCANC
Chad Phone #: ###-####