BLD17-03774
| FIRE-Final Inspection | 2/20/2018 | 2/20/2018 | 2/22/2018 10:30:58 AM | P | PASS |
|
|
Life safety passed
Chad Phone #: ###-####
|
BLD17-00644
| FIRE-Final Inspection | 2/19/2018 | 2/20/2018 | 2/20/2018 2:34:55 PM | P | PASS |
|
|
Life safety passed
|
FIR16-00628
| INSP-Final Inspection | 2/19/2018 | 2/20/2018 | 2/20/2018 2:34:33 PM | A | PART |
|
|
Today we verified function of various room detectors, two of the three roof top units and the delayed egress doors. I noted that one hvac unit did not function and I need verification that the spot type detector being utilized is listed for the max air flow expected in the hvac unit, the southwest delayed egress door did not function.
|
BLD18-00159
| FIRE-Conference | 2/20/2018 | 2/20/2018 | 2/20/2018 2:00:52 PM | P | DONE |
|
|
Abel Phone #: ###-####
|
BLD17-04514
| FIRE-Final Inspection | 2/19/2018 | 2/20/2018 | 2/20/2018 12:27:46 PM | P | PASS |
|
|
Life safety passed.
Phone #: ###-#### Inspection requested via web by Scott Simons
|
BLD17-03725
| FIRE-Final Inspection | 2/20/2018 | 2/20/2018 | 2/20/2018 11:41:32 AM | P | PASS |
|
|
Life safety passed
Zack Phone #: ###-####-please do as early PM as possible as the building final is late pm today
|
FIR18-00055
| INSP-Final Inspection | 2/20/2018 | 2/20/2018 | 2/20/2018 10:30:58 AM | P | PASS |
|
|
permit finaled
John Phone #: ###-####
|
BLD18-00214
| FIRE-Final Inspection | 2/16/2018 | 2/20/2018 | 2/20/2018 10:27:13 AM | A | PASS |
|
|
Life safety passed
Matt Phone #: ###-####
|
FIR17-00454
| INSP-Sprinkler Rough-in | 2/19/2018 | 2/20/2018 | 2/20/2018 10:10:26 AM | A | PASS |
|
|
Tenting and pipe rough-in passed. Piping can be covered.
|
BLD16-01757
| FIRE-Alarm Testing | 2/19/2018 | 2/20/2018 | 2/20/2018 8:23:15 AM | A | CANC |
|
|
continued phased inspection of alarms Phone #: ###-#### Inspection requested via web by Steve Jacobsen
|
BLD17-03725
| FIRE-Final Inspection | 2/14/2018 | 2/20/2018 | 2/20/2018 8:15:11 AM | A | FAIL |
|
|
Two exit signs failed to function
Zach Phone #: ###-####
|
FIR17-00522
| INSP-Sprinkler Rough-in | 2/16/2018 | 2/20/2018 | 2/20/2018 7:56:24 AM | A | FAIL |
|
|
There were no city approved plans on site to verify the earthquake bracing. I noted that the earthquake attachments for the cpvc piping are not shown on the plans.
hallways on 4th,3rd and 2nd Phone #: ###-#### Inspection requested via web by Matthew Lewis
|
BLD17-04025
| FIRE-Final Inspection | 2/20/2018 | 2/20/2018 | 2/20/2018 12:00:00 AM | P | CANC |
|
|
Chad Phone #: ###-####
|