BLD18-00134
| BLD-Conference | 2/20/2018 | 2/20/2018 | 2/20/2018 12:00:00 AM | A | DONE |
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Melissa Jannusch ###-####.
|