ELE19-00499
| Electrical Rough-In | 2/19/2019 | 2/20/2019 | 2/20/2019 3:28:28 PM | P | PASS |
|
|
Please call 1\2- 1 hour before you go. I would like to walk through to show you all we did. Phone #: ###-#### Inspection requested via web by Greg Idsinga Kitchen, master bed and bath wih floor heat in bath and closet rough in ok cover
|
ELE19-00241
| Electrical Rough-In | 2/19/2019 | 2/20/2019 | 2/20/2019 2:37:45 PM | P | PART |
|
|
Contact: Dan Schmidt Phone #: ###-#### Inspection requested via web by Deb Gooden Walls except cafe rough in ok cover
|
ELE18-01929
| Final | 2/15/2019 | 2/20/2019 | 2/20/2019 1:41:18 PM | P | PART |
|
|
Phone #: ###-#### Inspection requested via web by Alan Lusk 110.8, 11,27(B), 300.3(A)- Exposed conductors running in and out of meter bases shall be installed in a recognized wiring method of chapter 3. 230.70(A)(1)- Main disconnecting means of service shall be on exterior of building or immediately on inside. BCC 4 05 31(C)- Unfused conductors shall not enter a structure unless underground fed with a max of 4 1/2' in length. 240.24- Over current devices shall not be installed over stairs. Service reconnect was granted on temporary basis so other tenants would not be without power for an extended period of time. 60 amp feeds to each apartment ok to remain if no changes done to apartments. Complete service change is required. Unit 4 tested ok. TCO ok
|
ELE18-04858
| Final | 2/19/2019 | 2/20/2019 | 2/20/2019 12:53:05 PM | P | PASS |
|
|
inspection Phone #: ###-#### Inspection requested via web by David Feller Final ok
|
ELE18-04702
| Electrical Rough-In | 2/19/2019 | 2/20/2019 | 2/20/2019 11:26:37 AM | A | PASS |
|
|
There is a lock box on the back shop door, code 2020. If you have any questions please feel free to contact Luke ###-####. Thanks!! Phone #: ###-#### Inspection requested via web by Clayton Morgan Discussed with contractor service calculation results in approx. 140 amp minimum service needed for an additional branch circuit for hot tub. Contractor to increase service or prove calculation less than what exists by final. House rewire rough in ok cover
|
ELE19-00408
| Electrical Rough-In | 2/19/2019 | 2/20/2019 | 2/20/2019 10:43:19 AM | A | PASS |
|
|
Contact: Josh Mangum Phone #: ###-#### Inspection requested via web by Deb Gooden Bar walls rough in ok cover
|
ELE18-01608
| Electrical Rough-In | 2/19/2019 | 2/20/2019 | 2/20/2019 10:05:25 AM | A | PASS |
|
|
Common area ceiling inspection, Building D7 Phone #: ###-#### Inspection requested via web by Mike McCarrel Service inspection to be requested for main distibution panel all sub- feeds to be installed as needed. D-7 ceiling rough in ok cover
|
ELE19-00154
| Final | 2/19/2019 | 2/20/2019 | 2/20/2019 6:33:49 AM | A | CANC |
|
|
code 2468 Phone #: ###-#### >> Inspection requested via web by Icon Electric Inspection cancelled from web by: Icon Electric
|