Inspections for the day of: Wednesday, February 20, 2019.
Number of inspections: 13
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTom Saunders
TitleELE-INSPECTOR
Phone #208-794-1923
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ELE19-00487 Electrical Rough-In2/20/20192/20/20192/21/2019 7:34:12 AMPPASS
Will not be on site. Please give at least 30 minutes prior notice and I will meet you there Phone #: ###-#### Inspection requested via web by Jason Parke....

new wall and hard lid cover ok
floor box for future installed...pipes ok to cover
ELE19-00624 Rough-In Permanent Service2/19/20192/20/20192/20/2019 3:18:11 PMPPASS
Phone #: ###-#### Inspection requested via web by Same Electric...
p/s u/g reconnect ok
ELE17-02625 Electrical Rough-In2/19/20192/20/20192/20/2019 2:31:07 PMPCANC
call for access- Charles Phone #: ###-####
not ready...changed to conference
ELE17-02625 Conference2/20/20192/20/20192/20/2019 2:29:04 PMPPASS
call for access- Charles Phone #: ###-####
discussed wiring of new house
box fill, small appliance circuit, dining circuit, required outlets, A/C wiring and disconnect
ELE18-03408 Final2/20/20192/20/20192/20/2019 12:42:41 PMPPASS
Please call 45 minutes in advance so someone can meet you at site.
made corrections from failed inspection yesterday Phone #: ###-#### Inspection requested via web by Tim Dunlop...
corrections made..ok to final
ELE19-00591 Temporary Service2/19/20192/20/20192/20/2019 12:12:51 PMPPASS
Phone #: ###-#### Inspection requested via web by Rachael Moore....
t/s u/g new ok
ELE19-00544 Electrical Rough-In2/19/20192/20/20192/20/2019 11:23:26 AMAPASS
Jordan Phone #: ###-####...
UL listed equipment verified by pics due to snow cover...line side tap...panel on exterior of house with access
ELE18-04601 Final2/14/20192/20/20192/20/2019 10:51:29 AMAPASS
We have left plans on site in the meter box Phone #: ###-#### Inspection requested via web by Brecklee Brown...
labelling, disconnect, and OCPD ok
ELE18-03476 Electrical Rough-In2/19/20192/20/20192/20/2019 9:51:29 AMAPASS
Zach...###-####...
wall cover area C marked on plans
minus pony walls nurses station
ELE18-03691 Final2/20/20192/20/20192/20/2019 9:10:18 AMAPASS
final permit...job complete
ELE19-00592 Electrical Rough-In2/19/20192/20/20192/20/2019 9:05:29 AMAPASS
As early as possible please-Josh Phone #: ###-####...
circuits fished in...10/2 M/C and metal boxes
outlets installed
verify circuits on 25A breaker as per nameplate on equipment at final
ELE18-04422 Final2/19/20192/20/20192/20/2019 8:14:21 AMAPASS
Contact: Brian Gee Phone #: ###-#### Inspection requested via web by Deb Gooden...
correction made...ok to final
ELE19-00631 Electrical Rough-In2/20/20192/20/20192/20/2019 7:38:29 AMACANC
Phone #: ###-#### Inspection requested via web by Kerri Hamilton...Kerri called and requested be cancelled due to weather