BLD00-01999
| BLD-Framing/Rough-in | 2/20/2001 | 2/21/2001 | 2/21/2001 12:00:00 AM | A | PASS |
|
|
###-####
|
BLD00-03070
| BLD-Framing/Rough-in | 2/20/2001 | 2/21/2001 | 2/21/2001 12:00:00 AM | A | PASS |
|
|
###-####
|
BLD00-02920
| BLD-Wall cover | 2/20/2001 | 2/21/2001 | 2/21/2001 12:00:00 AM | A | NR |
|
|
Scheduled by a contractor via Hello! on 02/20/2001 at 17:23:06. Contact: ###-####.
|
BLD00-03587
| BLD-Final | 2/21/2001 | 2/21/2001 | 2/21/2001 12:00:00 AM | P | PASS |
|
|
late pm call first ###-####
|
MEC01-00495
| Pressure Test | 2/20/2001 | 2/21/2001 | 2/21/2001 12:00:00 AM | P | PART |
|
|
Scheduled by a contractor via Hello! on 02/20/2001 at 15:38:49. Contact: ###-####. remove regulator from water. 2/21/2001 3:48:05 PM to be check at rough in . gas p/t ok 2/21/2001 3:48:41 PM
|
BLD00-01563
| BLD-Concrete | 2/19/2001 | 2/21/2001 | 2/21/2001 12:00:00 AM | P | PART |
|
|
Scheduled by a contractor via Hello! on 02/19/2001 at 07:08:55. Contact: ###-####. covered with special insp. pending report. 2/21/2001 12:24:40 PM
|